EC Coal Bristol County
GreenfieldBristol County, Massachusetts · ISO-NE
EC Coal Bristol County is a greenfield datacenter candidate site in Bristol County, Massachusetts, interconnecting through ISO-NE. It screens at 57.6/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Bristol County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| HATHAWAY STREET | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 65.5 |
| TAP135387 | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 64.8 |
| TAUNTON TAP | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 64.2 |
| Greenfield (BERRY STREET - FALL RIVER (345) | Greenfield | 345 kV | 600 MW | 3.5 yrs | 62.6 |
| SOMERSET | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 62.4 |
| SYKES ROAD | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 62.3 |
| TAP135391 | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 61.9 |
| TAP136647 | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 61.4 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for EC Coal Bristol County, Bristol County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.