Skip to content
Gridcensus

EC Coal Bristol County

Greenfield

Bristol County, Massachusetts · ISO-NE

DC Readiness
56.9
Good / 100

EC Coal Bristol County is a greenfield datacenter candidate site in Bristol County, Massachusetts, interconnecting through ISO-NE. It screens at 56.9/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneISONE_MA
Wholesale LMP$69.64/MWh
Utility commercial rate0.17¢/kWh
UtilityTOWN OF NORTH ATTLEBOROUGH - (MA)municipal

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionISO-NE
Queue depth25
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate25%
Withdrawal rate75%

Connectivity

Nearest IXPProv.net 935
IXP distance15.1 mi
Fiber providers7
Fiber coverage33.4%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance382.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerLedo Robert J
Land contactBristol County County Assessor
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity
Former usecoal adjacent

Risk & environment

Environmental constraintModerate (45/100)
Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyPresent
Superfund siteBOTELHOS AUTO BODY GARAGE INC
Hazard sub-score58/100
Construction cost index108.6 (avg 100)

Location context

Nearest datacenterCrown Castle Providence (235 Promenade)
DC distance15.1 mi
Nearest rail1.3 mi
Nearest gas pipeline0.2 mi
Nearest fiber route43.1 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity17.41¢/kWh
Industrial electricity16.54¢/kWh
Cooling degree days600
Heating degree days5,900
Land price / acre$21,221

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Coal Bristol County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
47
Fiber connectivity12%
72
Energy cost10%
58
Water risk7%
92
Natural hazard6%
58
Buildability7%
92
Labor market4%
50
DC cluster4%
80
Land / acreage3%
30
Construction cost3%
60
Gas pipeline2%
99
Tax incentive1%
0
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Bristol County, ranked by DC Readiness.

Sites near EC Coal Bristol County
SiteTypeVoltageCapacityQueue waitScore
OZ BristolGreenfield——3.5 yrs58.3
EC Coal Bristol CountyGreenfield——3.5 yrs58.1
EC Near Cleary Flood HybridGreenfield——3.5 yrs57.7
EC Near MansfieldGreenfield——3.5 yrs57.6
EC Coal Bristol CountyGreenfield——3.5 yrs57.5
OZ BristolGreenfield——3.5 yrs56.8
EC Near Cleary Flood HybridGreenfield——3.5 yrs56.6
CLEARY FLOODSubstation-Adjacent115 kV100 MW3.9 yrs56.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Coal Bristol County, Bristol County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.