Datacenter Sites in Penobscot, Maine

Penobscot has 151 scored datacenter candidate sites averaging 54.8/100 DC Readiness, with a catalogued aggregate of 1,000 MW. FEMA rates local natural-hazard risk as "Relatively Low".

At a glance

Penobscot, Maine has 151 scored datacenter candidate sites averaging 54.8/100 DC Readiness, roughly in line with the Maine average of 53.5. It ranks 2nd of 16 Maine counties by number of sites and 2nd by average score. The top-scoring site is CHESTER STATIC VAR COMPENSATOR at 63.8/100.

151
Candidate sites
54.8/100
Avg DC Readiness
1,000 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Penobscot

Site-selection context for Penobscot

No
Datacenter tax incentive
16.92¢/kWh
Commercial electricity
12.90¢/kWh
Industrial electricity
13
Fiber providers
Low
Water stress
$3,836
Land price / acre
300
Cooling degree days
7,500
Heating degree days
42°F
Mean annual temp

How does Penobscot compare with other counties in Maine?

By number of scored sites, Penobscot ranks 2nd of the 16 Maine counties with a county page, holding 13% of the state's 1,183 sites. Its average DC Readiness of 54.8/100 ranks 2nd in the state and is roughly in line with the national average of 53.0. Nationally it has the 173rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 86 score 55 or higher.

What types of datacenter sites are in Penobscot?

Industrial sites are the most common (90, 60% of the county's inventory), followed by former mine (32) and greenfield (18). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Penobscot?

Industrial electricity averages 12.90¢/kWh and commercial 16.92¢/kWh. FEMA's National Risk Index rates the county "Relatively Low" (15). WRI water stress is low. 13 fiber providers report service in the county. The climate runs 300 cooling degree days a year with a mean temperature of 42°F. Land is valued around $3,836 an acre.

By site type

Top datacenter sites in Penobscot

Top datacenter sites in Penobscot
SiteTypeVoltageCapacityQueue waitScore
CHESTER STATIC VAR COMPENSATORSubstation-Adjacent345 kV600 MW4.3 yrs63.8
EC Near Red Shield Envir Old Town FacilityGreenfield——4.3 yrs61.8
OZ PenobscotGreenfield——4.3 yrs61.2
EC Near Red Shield Envir Old Town FacilityGreenfield——4.3 yrs60.5
EC Near Red Shield Envir Old Town FacilityGreenfield——4.3 yrs59.5
UNKNOWN136689Substation-Adjacent115 kV100 MW4.3 yrs59.1
UNKNOWN133137Substation-Adjacent115 kV100 MW4.3 yrs59.1
POWERSVILLE ROADSubstation-Adjacent115 kV100 MW4.3 yrs57.7
EC Near Red Shield Envir Old Town FacilityGreenfield——4.3 yrs57.6
EC Near Red Shield Envir Old Town FacilityGreenfield——4.3 yrs57.1
Mine SiteFormer Mine——4.3 yrs57.1
Jefferson St. SchoolIndustrial——4.3 yrs57.0
Main Street JunkyardIndustrial——4.3 yrs57.0
Byer Manufacturing CompanyIndustrial——4.3 yrs57.0
Mine SiteFormer Mine——4.3 yrs57.0
Jefferson Street SchoolIndustrial——4.3 yrs57.0
Mine SiteFormer Mine——4.3 yrs57.0
Old Town Canoe - Lot 11Industrial——4.3 yrs57.0
Mine SiteFormer Mine——4.3 yrs57.0
Main Street Junkyard, BradleyIndustrial——4.3 yrs57.0
Webster's MillIndustrial——4.3 yrs57.0
Bradley Parcel 1Industrial——4.3 yrs57.0
Bradley Parcel 2Industrial——4.3 yrs57.0
Mine SiteFormer Mine——4.3 yrs57.0
MFGR Paper MillIndustrial——4.3 yrs57.0

Every scored site in Penobscot

All 151 sites, best first.

Penobscot datacenter FAQ

How many datacenter sites are in Penobscot?

151 scored datacenter candidate sites, averaging 54.8/100 DC Readiness. That is the 2nd-most of 16 Maine counties with five or more sites.

What is the highest-scoring datacenter site in Penobscot?

CHESTER STATIC VAR COMPENSATOR scores 63.8/100 DC Readiness, the highest of the 151 scored sites in Penobscot (a substation-adjacent site).

Does Penobscot offer datacenter tax incentives?

No datacenter-specific tax incentive is on record for Penobscot in the GridCensus county dataset.

What is the natural-hazard risk in Penobscot?

FEMA's National Risk Index rates Penobscot as "Relatively Low" (score 15).

What are industrial electricity rates in Penobscot?

Average industrial electricity is 12.90¢/kWh and commercial is 16.92¢/kWh in Penobscot.

More in Maine

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Penobscot, Maine”, https://gridcensus.com/datacenter-sites/maine/penobscot (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Penobscot, Maine is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.