MILLINOCKET

Federal Excess

Penobscot, Maine · ISO-NE

DC Readiness
40.5
Fair / 100

MILLINOCKET is a federal excess datacenter candidate site in Penobscot, Maine, interconnecting through ISO-NE. It screens at 40.5/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionISO-NE
Queue depth32

Connectivity

Nearest IXPUniversity of Maine - Neville Telecom Colo
IXP distance47.9 mi

Site characteristics

Acreage75 ac
Former useNavigation and Traffic Aids

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterUniversity of Maine - Neville Telecom Colo
DC distance47.9 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity16.92¢/kWh
Industrial electricity12.90¢/kWh
Cooling degree days300
Heating degree days7,500
Land price / acre$3,836

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
26
Fiber connectivity12%
53
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Penobscot, ranked by DC Readiness.

Sites near MILLINOCKET
SiteTypeVoltageCapacityQueue waitScore
CHESTERSubstation-Adjacent345 kV600 MW3.5 yrs67.7
EC Near Red Shield Envir Old Town FacilityGreenfield3.5 yrs61.8
OZ PenobscotGreenfield3.5 yrs61.4
UNKNOWN136689Substation-Adjacent115 kV100 MW3.5 yrs60.9
EC Near Red Shield Envir Old Town FacilityGreenfield3.5 yrs60.6
Greenfield (CHESTER - None)Greenfield345 kV600 MW3.5 yrs60.1
EC Near Red Shield Envir Old Town FacilityGreenfield3.5 yrs60.0
Greenfield (CHESTER - None)Greenfield345 kV600 MW3.5 yrs59.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MILLINOCKET, Penobscot. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.