Datacenter Sites in Meade County, Kentucky
Meade County has 18 scored datacenter candidate sites averaging 55.8/100 DC Readiness, with a catalogued aggregate of 850 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
At a glance
Meade County, Kentucky has 18 scored datacenter candidate sites averaging 55.8/100 DC Readiness, roughly in line with the Kentucky average of 51.8. It ranks 70th of 117 Kentucky counties by number of sites and 30th by average score. The top-scoring site is Substation-Adjacent site · 518f73e1 at 61.3/100.
Site-selection context for Meade County
Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.
How does Meade County compare with other counties in Kentucky?
By number of scored sites, Meade County ranks 70th of the 117 Kentucky counties with a county page, holding 0.2% of the state's 7,741 sites. Its average DC Readiness of 55.8/100 ranks 30th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1835th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 14 score 55 or higher.
What types of datacenter sites are in Meade County?
Substation-Adjacent sites are the most common (13, 72% of the county's inventory), followed by former mine (3) and greenfield (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Meade County?
Industrial electricity averages 5.59¢/kWh and commercial 12.75¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 2 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 56°F. Land is valued around $5,432 an acre.
By site type
Top datacenter sites in Meade County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN127531 | Substation-Adjacent | 138 kV | 100 MW | 3.9 yrs | 61.3 |
| MEADE COUNTY | Substation-Adjacent | 161 kV | 100 MW | 4.3 yrs | 58.6 |
| UNKNOWN127814 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 57.0 |
| UNKNOWN127529 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 57.0 |
| TAP140177 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 56.8 |
| EC FFE Meade County | Greenfield | — | — | 4.3 yrs | 56.7 |
| UNKNOWN169419 | Substation-Adjacent | 69 kV | 50 MW | 3.0 yrs | 56.5 |
| UNKNOWN127813 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 56.5 |
| UNKNOWN127837 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 56.0 |
| TAP140178 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 55.7 |
| TAP155724 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 55.7 |
| UNKNOWN127815 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 55.6 |
| UNKNOWN127528 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 55.2 |
| UNKNOWN127527 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 55.1 |
| Mine Site | Former Mine | — | — | 3.9 yrs | 54.9 |
| Greenfield (MEADE COUNTY - TAP155581) | Greenfield | 161 kV | 100 MW | 4.3 yrs | 52.3 |
| Mine Site | Former Mine | — | — | 4.3 yrs | 52.0 |
| Mine Site | Former Mine | — | — | 4.3 yrs | 50.8 |
Every scored site in Meade County
All 18 sites, best first.
- Substation-Adjacent site · 518f73e1 · 61.3
- MEADE COUNTY · 58.6
- Substation-Adjacent site · 1c6fd24f · 57.0
- Substation-Adjacent site · 07fe9cfc · 57.0
- Substation-Adjacent site · b2f68741 · 56.8
- EC FFE Meade County · 56.7
- Substation-Adjacent site · 5cb2dea7 · 56.5
- Substation-Adjacent site · 86a4e1c8 · 56.5
- Substation-Adjacent site · df66797b · 56.0
- Substation-Adjacent site · 72439357 · 55.7
- Substation-Adjacent site · bce56772 · 55.7
- Substation-Adjacent site · 82a60d00 · 55.6
- Substation-Adjacent site · 8dff3354 · 55.2
- Substation-Adjacent site · a83c9918 · 55.1
- Mine Site · 0497a92e · 54.9
- Greenfield (MEADE COUNTY - TAP155581) · 52.3
- Mine Site · 9c029ab6 · 52.0
- Mine Site · 33433044 · 50.8
Meade County datacenter FAQ
How many datacenter sites are in Meade County?
18 scored datacenter candidate sites, averaging 55.8/100 DC Readiness. That is the 70th-most of 117 Kentucky counties with five or more sites.
What is the highest-scoring datacenter site in Meade County?
Substation-Adjacent site · 518f73e1 scores 61.3/100 DC Readiness, the highest of the 18 scored sites in Meade County (a substation-adjacent site).
Does Meade County offer datacenter tax incentives?
Sales tax exemption on electricity for large industrial users; KBI tax credits.
What is the natural-hazard risk in Meade County?
FEMA's National Risk Index rates Meade County as "Relatively Moderate" (score 30).
What are industrial electricity rates in Meade County?
Average industrial electricity is 5.59¢/kWh and commercial is 12.75¢/kWh in Meade County.
More in Kentucky
- All datacenter sites in Kentucky· 7,741 sites
- Operating datacenters in Kentucky
- Electric substations in Kentucky
- Pike County· 901 sites · avg 49.4
- Letcher County· 531 sites · avg 47.8
- Floyd County· 326 sites · avg 51.0
- Perry County· 283 sites · avg 48.2
- Harlan County· 280 sites · avg 53.6
- Knott County· 278 sites · avg 51.2
- Substation-Adjacent sites in Kentucky
- Former Mine sites in Kentucky
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Meade County, Kentucky”, https://gridcensus.com/datacenter-sites/kentucky/meade-county (data as of November 13, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Meade County, Kentucky is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.