Datacenter Sites in Larue County, Kentucky
Larue County has 15 scored datacenter candidate sites averaging 52.5/100 DC Readiness, with a catalogued aggregate of 1,300 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
At a glance
Larue County, Kentucky has 15 scored datacenter candidate sites averaging 52.5/100 DC Readiness, roughly in line with the Kentucky average of 51.8. It ranks 82nd of 117 Kentucky counties by number of sites and 71st by average score. The top-scoring site is Substation-Adjacent site · 3f50c4cf at 56.4/100.
Site-selection context for Larue County
Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.
How does Larue County compare with other counties in Kentucky?
By number of scored sites, Larue County ranks 82nd of the 117 Kentucky counties with a county page, holding 0.2% of the state's 7,741 sites. Its average DC Readiness of 52.5/100 ranks 71st in the state and is roughly in line with the national average of 53.0. Nationally it has the 2019th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 4 score 55 or higher.
What types of datacenter sites are in Larue County?
Substation-Adjacent sites are the most common (8, 53% of the county's inventory), followed by greenfield (5) and former mine (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Larue County?
Industrial electricity averages 6.88¢/kWh and commercial 11.79¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 56°F. Land is valued around $5,124 an acre.
By site type
Top datacenter sites in Larue County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN125681 | Substation-Adjacent | 69 kV | 50 MW | 3.9 yrs | 56.4 |
| UNKNOWN127842 | Substation-Adjacent | 69 kV | 50 MW | 3.9 yrs | 56.1 |
| TAP155030 | Substation-Adjacent | 69 kV | 50 MW | 3.9 yrs | 56.1 |
| EC FFE Larue County | Greenfield | — | — | 4.7 yrs | 56.0 |
| UNKNOWN125491 | Substation-Adjacent | 69 kV | 50 MW | 3.9 yrs | 54.9 |
| Greenfield (BROWN PLANT - HARDIN) | Greenfield | 345 kV | 600 MW | 4.7 yrs | 54.3 |
| LaRue County I-65 Industrial Park at Upton | Shovel-Ready | — | — | 3.9 yrs | 52.7 |
| TAP153718 | Substation-Adjacent | 69 kV | 50 MW | 4.7 yrs | 52.5 |
| TAP153714 | Substation-Adjacent | 69 kV | 50 MW | 4.7 yrs | 52.1 |
| TAP155492 | Substation-Adjacent | 69 kV | 50 MW | 4.7 yrs | 52.0 |
| TAP160447 | Substation-Adjacent | 69 kV | 50 MW | 4.7 yrs | 52.0 |
| Greenfield (TAP138385 - SUMMER SHADE) | Greenfield | 161 kV | 100 MW | 4.7 yrs | 48.8 |
| Greenfield (UNKNOWN125682 - UNKNOWN127827) | Greenfield | 138 kV | 100 MW | 4.7 yrs | 48.4 |
| Greenfield (UNKNOWN124687 - UNKNOWN125487) | Greenfield | 138 kV | 100 MW | 4.7 yrs | 47.8 |
| Mine Site | Former Mine | — | — | 4.7 yrs | 47.5 |
Every scored site in Larue County
All 15 sites, best first.
- Substation-Adjacent site · 3f50c4cf · 56.4
- Substation-Adjacent site · 6a706de5 · 56.1
- Substation-Adjacent site · 1ae1df0d · 56.1
- EC FFE Larue County · 56.0
- Substation-Adjacent site · 076b4638 · 54.9
- Greenfield (BROWN PLANT - HARDIN) · 54.3
- LaRue County I-65 Industrial Park at Upton · 52.7
- Substation-Adjacent site · 03622866 · 52.5
- Substation-Adjacent site · c3f4f572 · 52.1
- Substation-Adjacent site · 4aac2366 · 52.0
- Substation-Adjacent site · bfb77b07 · 52.0
- Greenfield (TAP138385 - SUMMER SHADE) · 48.8
- Greenfield (UNKNOWN125682 - UNKNOWN127827) · 48.4
- Greenfield (UNKNOWN124687 - UNKNOWN125487) · 47.8
- Mine Site · 4c0df27e · 47.5
Larue County datacenter FAQ
How many datacenter sites are in Larue County?
15 scored datacenter candidate sites, averaging 52.5/100 DC Readiness. That is the 82nd-most of 117 Kentucky counties with five or more sites.
What is the highest-scoring datacenter site in Larue County?
Substation-Adjacent site · 3f50c4cf scores 56.4/100 DC Readiness, the highest of the 15 scored sites in Larue County (a substation-adjacent site).
Does Larue County offer datacenter tax incentives?
Sales tax exemption on electricity for large industrial users; KBI tax credits.
What is the natural-hazard risk in Larue County?
FEMA's National Risk Index rates Larue County as "Relatively Moderate" (score 30).
What are industrial electricity rates in Larue County?
Average industrial electricity is 6.88¢/kWh and commercial is 11.79¢/kWh in Larue County.
More in Kentucky
- All datacenter sites in Kentucky· 7,741 sites
- Operating datacenters in Kentucky
- Electric substations in Kentucky
- Pike County· 901 sites · avg 49.4
- Letcher County· 531 sites · avg 47.8
- Floyd County· 326 sites · avg 51.0
- Perry County· 283 sites · avg 48.2
- Harlan County· 280 sites · avg 53.6
- Knott County· 278 sites · avg 51.2
- Substation-Adjacent sites in Kentucky
- Greenfield sites in Kentucky
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Larue County, Kentucky”, https://gridcensus.com/datacenter-sites/kentucky/larue-county (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Larue County, Kentucky is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.