Skip to content
Gridcensus

Datacenter Sites in Edmonson, Kentucky

Edmonson has 14 scored datacenter candidate sites averaging 54.2/100 DC Readiness, with a catalogued aggregate of 50 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Edmonson, Kentucky has 14 scored datacenter candidate sites averaging 54.2/100 DC Readiness, roughly in line with the Kentucky average of 51.8. It ranks 83rd of 117 Kentucky counties by number of sites and 48th by average score. The top-scoring site is EC FFE Edmonson County at 58.1/100.

14
Candidate sites
54.2/100
Avg DC Readiness
50 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 14 in Edmonson

Site-selection context for Edmonson

Yessales_tax_exemption
Datacenter tax incentive
10.98¢/kWh
Commercial electricity
6.27¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$4,420
Land price / acre
1,300
Cooling degree days
4,300
Heating degree days
56°F
Mean annual temp

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

How does Edmonson compare with other counties in Kentucky?

By number of scored sites, Edmonson ranks 83rd of the 117 Kentucky counties with a county page, holding 0.2% of the state's 7,741 sites. Its average DC Readiness of 54.2/100 ranks 48th in the state and is roughly in line with the national average of 53.0. Nationally it has the 2089th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 4 score 55 or higher.

What types of datacenter sites are in Edmonson?

Former Mine sites are the most common (9, 64% of the county's inventory), followed by shovel-ready (2) and greenfield (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Edmonson?

Industrial electricity averages 6.27¢/kWh and commercial 10.98¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 6 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 56°F. Land is valued around $4,420 an acre.

By site type

Top datacenter sites in Edmonson

Top datacenter sites in Edmonson
SiteTypeVoltageCapacityQueue waitScore
EC FFE Edmonson CountyGreenfield——3.9 yrs58.1
UNKNOWN124078Substation-Adjacent69 kV50 MW3.9 yrs57.8
Mine SiteFormer Mine——3.9 yrs55.1
Mine SiteFormer Mine——3.9 yrs55.0
Mine SiteFormer Mine——3.9 yrs54.6
Mine SiteFormer Mine——3.9 yrs54.1
Mine SiteFormer Mine——3.9 yrs53.9
Mine SiteFormer Mine——3.9 yrs53.9
Mine SiteFormer Mine——3.9 yrs53.9
Mine SiteFormer Mine——3.9 yrs53.7
OZ EdmonsonGreenfield——3.9 yrs53.1
Mine SiteFormer Mine——3.9 yrs52.9
Edmonson County Industrial Park IIShovel-Ready——4.7 yrs51.2
Edmonson County Industrial ParkShovel-Ready——4.7 yrs50.8

Every scored site in Edmonson

All 14 sites, best first.

Edmonson datacenter FAQ

How many datacenter sites are in Edmonson?

14 scored datacenter candidate sites, averaging 54.2/100 DC Readiness. That is the 83rd-most of 117 Kentucky counties with five or more sites.

What is the highest-scoring datacenter site in Edmonson?

EC FFE Edmonson County scores 58.1/100 DC Readiness, the highest of the 14 scored sites in Edmonson (a greenfield site).

Does Edmonson offer datacenter tax incentives?

Sales tax exemption on electricity for large industrial users; KBI tax credits.

What is the natural-hazard risk in Edmonson?

FEMA's National Risk Index rates Edmonson as "Relatively Moderate" (score 30).

What are industrial electricity rates in Edmonson?

Average industrial electricity is 6.27¢/kWh and commercial is 10.98¢/kWh in Edmonson.

More in Kentucky

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Edmonson, Kentucky”, https://gridcensus.com/datacenter-sites/kentucky/edmonson (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Edmonson, Kentucky is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.