Datacenter Sites in Carlisle, Kentucky
Carlisle has 7 scored datacenter candidate sites averaging 56.3/100 DC Readiness, with a catalogued aggregate of 0 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
At a glance
Carlisle, Kentucky has 7 scored datacenter candidate sites averaging 56.3/100 DC Readiness, roughly in line with the Kentucky average of 51.8. It ranks 111th of 117 Kentucky counties by number of sites and 27th by average score. The top-scoring site is EC FFE Carlisle County at 61.9/100.
Site-selection context for Carlisle
Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.
How does Carlisle compare with other counties in Kentucky?
By number of scored sites, Carlisle ranks 111th of the 117 Kentucky counties with a county page, holding 0.1% of the state's 7,741 sites. Its average DC Readiness of 56.3/100 ranks 27th in the state and is roughly in line with the national average of 53.0. Nationally it has the 2670th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 3 score 55 or higher.
What types of datacenter sites are in Carlisle?
Shovel-Ready sites are the most common (3, 43% of the county's inventory), followed by greenfield (2) and industrial (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Carlisle?
Industrial electricity averages 6.17¢/kWh and commercial 10.70¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 4 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 56°F. Land is valued around $5,470 an acre.
By site type
Top datacenter sites in Carlisle
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC FFE Carlisle County | Greenfield | — | — | 3.9 yrs | 61.9 |
| OZ Carlisle | Greenfield | — | — | 3.9 yrs | 60.9 |
| Bardwell -- Secondary Site 039-002 | Shovel-Ready | — | — | 3.9 yrs | 55.5 |
| Bardwell -- Secondary Site 039-003 | Shovel-Ready | — | — | 3.9 yrs | 54.7 |
| Arlington -- Site 039-001 | Shovel-Ready | — | — | 3.9 yrs | 53.8 |
| Mine Site | Former Mine | — | — | 3.9 yrs | 53.7 |
| Deena Products | Industrial | — | — | 3.9 yrs | 53.3 |
Every scored site in Carlisle
All 7 sites, best first.
- EC FFE Carlisle County · 61.9
- OZ Carlisle · 60.9
- Bardwell -- Secondary Site 039-002 · 55.5
- Bardwell -- Secondary Site 039-003 · 54.7
- Arlington -- Site 039-001 · 53.8
- Mine Site · bc8f159d · 53.7
- Deena Products · 53.3
Carlisle datacenter FAQ
How many datacenter sites are in Carlisle?
7 scored datacenter candidate sites, averaging 56.3/100 DC Readiness. That is the 111th-most of 117 Kentucky counties with five or more sites.
What is the highest-scoring datacenter site in Carlisle?
EC FFE Carlisle County scores 61.9/100 DC Readiness, the highest of the 7 scored sites in Carlisle (a greenfield site).
Does Carlisle offer datacenter tax incentives?
Sales tax exemption on electricity for large industrial users; KBI tax credits.
What is the natural-hazard risk in Carlisle?
FEMA's National Risk Index rates Carlisle as "Relatively Moderate" (score 30).
What are industrial electricity rates in Carlisle?
Average industrial electricity is 6.17¢/kWh and commercial is 10.70¢/kWh in Carlisle.
More in Kentucky
- All datacenter sites in Kentucky· 7,741 sites
- Operating datacenters in Kentucky
- Electric substations in Kentucky
- Pike County· 901 sites · avg 49.4
- Letcher County· 531 sites · avg 47.8
- Floyd County· 326 sites · avg 51.0
- Perry County· 283 sites · avg 48.2
- Harlan County· 280 sites · avg 53.6
- Knott County· 278 sites · avg 51.2
- Shovel-Ready sites in Kentucky
- Greenfield sites in Kentucky
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Carlisle, Kentucky”, https://gridcensus.com/datacenter-sites/kentucky/carlisle (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Carlisle, Kentucky is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.