Datacenter Sites in Pratt, Kansas

Pratt has 28 scored datacenter candidate sites averaging 55.6/100 DC Readiness, with a catalogued aggregate of 1,500 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

28
Candidate sites
55.6/100
Avg DC Readiness
1,500 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Pratt

Site-selection context for Pratt

Yesproperty_tax_exemption
Datacenter tax incentive
10.69¢/kWh
Commercial electricity
7.78¢/kWh
Industrial electricity
6
Fiber providers
Medium-High
Water stress
$2,390
Land price / acre
1,400
Cooling degree days
5,000
Heating degree days
55°F
Mean annual temp

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

By site type

Top datacenter sites in Pratt

Top datacenter sites in Pratt
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN168686Substation-Adjacent345 kV600 MW3.3 yrs62.7
EC Near PrattGreenfield——3.5 yrs61.7
EC Near PrattGreenfield——3.5 yrs60.0
EC Near PrattGreenfield——3.5 yrs60.0
EC Near PrattGreenfield——3.5 yrs59.3
EC Near PrattGreenfield——3.5 yrs59.3
EC Near PrattGreenfield——3.5 yrs59.2
EC Near PrattGreenfield——3.5 yrs58.7
EC Near PrattGreenfield——3.5 yrs58.6
EC Near PrattGreenfield——3.5 yrs58.5
EC Near PrattGreenfield——3.5 yrs57.5
UNKNOWN118232Substation-Adjacent115 kV100 MW3.3 yrs56.8
UNKNOWN117999Substation-Adjacent115 kV100 MW3.3 yrs56.8
UNKNOWN118233Substation-Adjacent115 kV100 MW3.3 yrs56.7
UNKNOWN119937Substation-Adjacent115 kV100 MW3.3 yrs56.7
UNKNOWN117998Substation-Adjacent115 kV100 MW3.3 yrs56.7
UNKNOWN119935Substation-Adjacent115 kV100 MW3.3 yrs56.6
UNKNOWN119934Substation-Adjacent115 kV100 MW3.3 yrs56.6
Greenfield (UNKNOWN118233 - UNKNOWN169202)Greenfield115 kV100 MW3.3 yrs51.1
Mine SiteFormer Mine——3.3 yrs50.9
Mine SiteFormer Mine——3.3 yrs50.9
Lot 34, Pratt Airport Industrial ParkIndustrial——3.3 yrs50.7
Lot 15, Pratt Airport Industrial ParkIndustrial——3.3 yrs50.7
Lot 52, Pratt Airport Industrial ParkIndustrial——3.3 yrs50.6
Greenfield (UNKNOWN117999 - TAP149349)Greenfield115 kV100 MW3.3 yrs50.4

Pratt datacenter FAQ

How many datacenter sites are in Pratt?
28 scored datacenter candidate sites, averaging 55.6/100 DC Readiness.
Does Pratt offer datacenter tax incentives?
PEAK program payroll tax incentives; IRB property tax exemptions available.
What is the natural-hazard risk in Pratt?
FEMA's National Risk Index rates Pratt as "Relatively High" (score 35).
What are industrial electricity rates in Pratt?
Average industrial electricity is 7.78¢/kWh and commercial is 10.69¢/kWh in Pratt.

Dataset updated . Screening estimates derived from public data sources.