Datacenter Sites in Phillips, Kansas
Phillips has 21 scored datacenter candidate sites averaging 54.5/100 DC Readiness, with a catalogued aggregate of 402 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
21
Candidate sites
54.5/100
Avg DC Readiness
402 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for Phillips
Yesproperty_tax_exemption
Datacenter tax incentive
13.43¢/kWh
Commercial electricity
7.63¢/kWh
Industrial electricity
2
Fiber providers
Medium-High
Water stress
$1,912
Land price / acre
1,400
Cooling degree days
5,000
Heating degree days
55°F
Mean annual temp
Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.
By site type
Top datacenter sites in Phillips
Phillips datacenter FAQ
- How many datacenter sites are in Phillips?
- 21 scored datacenter candidate sites, averaging 54.5/100 DC Readiness.
- Does Phillips offer datacenter tax incentives?
- PEAK program payroll tax incentives; IRB property tax exemptions available.
- What is the natural-hazard risk in Phillips?
- FEMA's National Risk Index rates Phillips as "Relatively High" (score 35).
- What are industrial electricity rates in Phillips?
- Average industrial electricity is 7.63¢/kWh and commercial is 13.43¢/kWh in Phillips.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Phillips, Kansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.