Datacenter Sites in Decatur, Kansas

Decatur has 17 scored datacenter candidate sites averaging 55.5/100 DC Readiness, with a catalogued aggregate of 500 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Decatur, Kansas has 17 scored datacenter candidate sites averaging 55.5/100 DC Readiness, roughly in line with the Kansas average of 53.6. It ranks 43rd of 90 Kansas counties by number of sites and 13th by average score. The top-scoring site is EC Near Oberlin (KS) · 91dcc072 at 58.0/100.

17
Candidate sites
55.5/100
Avg DC Readiness
500 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 17 in Decatur

Site-selection context for Decatur

Yesproperty_tax_exemption
Datacenter tax incentive
12.26¢/kWh
Commercial electricity
7.69¢/kWh
Industrial electricity
3
Fiber providers
Medium-High
Water stress
$1,805
Land price / acre
1,400
Cooling degree days
5,000
Heating degree days
55°F
Mean annual temp

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

How does Decatur compare with other counties in Kansas?

By number of scored sites, Decatur ranks 43rd of the 90 Kansas counties with a county page, holding 0.7% of the state's 2,352 sites. Its average DC Readiness of 55.5/100 ranks 13th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1896th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 14 score 55 or higher.

What types of datacenter sites are in Decatur?

Greenfield sites are the most common (11, 65% of the county's inventory), followed by substation-adjacent (4) and industrial (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Decatur?

Industrial electricity averages 7.69¢/kWh and commercial 12.26¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (35). WRI water stress is medium-high. 3 fiber providers report service in the county. The climate runs 1,400 cooling degree days a year with a mean temperature of 55°F. Land is valued around $1,805 an acre.

By site type

Top datacenter sites in Decatur

Top datacenter sites in Decatur
SiteTypeVoltageCapacityQueue waitScore
EC Near Oberlin (KS)Greenfield——4.3 yrs58.0
EC Near Oberlin (KS)Greenfield——4.3 yrs57.8
EC Near Oberlin (KS)Greenfield——4.3 yrs57.8
EC Near Oberlin (KS)Greenfield——4.3 yrs57.6
EC Near Oberlin (KS)Greenfield——4.3 yrs57.5
EC Near Oberlin (KS)Greenfield——4.3 yrs57.5
EC Near Oberlin (KS)Greenfield——4.3 yrs57.3
EC Near Oberlin (KS)Greenfield——4.3 yrs56.8
EC Near Oberlin (KS)Greenfield——4.3 yrs56.7
EC Near Oberlin (KS)Greenfield——4.3 yrs56.6
UNKNOWN119602Substation-Adjacent115 kV100 MW4.3 yrs55.4
TAP140617Substation-Adjacent115 kV100 MW4.3 yrs55.3
UNKNOWN119601Substation-Adjacent115 kV100 MW4.3 yrs55.2
UNKNOWN119603Substation-Adjacent115 kV100 MW4.3 yrs55.1
Norcatur BTAIndustrial——4.3 yrs49.6
Bargain Box BTAIndustrial——4.3 yrs49.6
Greenfield (UNKNOWN119602 - TAP140617)Greenfield115 kV100 MW4.3 yrs48.9

Every scored site in Decatur

All 17 sites, best first.

Decatur datacenter FAQ

How many datacenter sites are in Decatur?

17 scored datacenter candidate sites, averaging 55.5/100 DC Readiness. That is the 43rd-most of 90 Kansas counties with five or more sites.

What is the highest-scoring datacenter site in Decatur?

EC Near Oberlin (KS) · 91dcc072 scores 58.0/100 DC Readiness, the highest of the 17 scored sites in Decatur (a greenfield site).

Does Decatur offer datacenter tax incentives?

PEAK program payroll tax incentives; IRB property tax exemptions available.

What is the natural-hazard risk in Decatur?

FEMA's National Risk Index rates Decatur as "Relatively High" (score 35).

What are industrial electricity rates in Decatur?

Average industrial electricity is 7.69¢/kWh and commercial is 12.26¢/kWh in Decatur.

More in Kansas

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Decatur, Kansas”, https://gridcensus.com/datacenter-sites/kansas/decatur (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Decatur, Kansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.