Datacenter Sites in Union, Iowa

Union has 14 scored datacenter candidate sites averaging 57.0/100 DC Readiness, with a catalogued aggregate of 200 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Union, Iowa has 14 scored datacenter candidate sites averaging 57.0/100 DC Readiness, roughly in line with the Iowa average of 56.3. It ranks 49th of 85 Iowa counties by number of sites and 31st by average score. The top-scoring site is OZ Union at 58.3/100.

14
Candidate sites
57.0/100
Avg DC Readiness
200 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 14 in Union

Site-selection context for Union

Yessales_tax_exemption
Datacenter tax incentive
13.42¢/kWh
Commercial electricity
8.19¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$5,970
Land price / acre
900
Cooling degree days
6,500
Heating degree days
48°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $1M+ investments; property tax phase-in for new construction.

How does Union compare with other counties in Iowa?

By number of scored sites, Union ranks 49th of the 85 Iowa counties with a county page, holding 0.5% of the state's 2,572 sites. Its average DC Readiness of 57.0/100 ranks 31st in the state and is roughly in line with the national average of 53.0. Nationally it has the 2089th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 13 score 55 or higher.

What types of datacenter sites are in Union?

Greenfield sites are the most common (11, 79% of the county's inventory), followed by substation-adjacent (3). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Union?

Industrial electricity averages 8.19¢/kWh and commercial 13.42¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 7 fiber providers report service in the county. The climate runs 900 cooling degree days a year with a mean temperature of 48°F. Land is valued around $5,970 an acre.

By site type

Top datacenter sites in Union

Top datacenter sites in Union
SiteTypeVoltageCapacityQueue waitScore
OZ UnionGreenfield——4.3 yrs58.3
EC Near Summit LakeGreenfield——4.3 yrs57.9
EC Near Summit LakeGreenfield——4.3 yrs57.7
EC Near Summit LakeGreenfield——4.3 yrs57.7
EC Near Summit LakeGreenfield——4.3 yrs57.5
EC Near Summit LakeGreenfield——4.3 yrs57.5
EC Near Summit LakeGreenfield——4.3 yrs57.5
EC Near Summit LakeGreenfield——4.3 yrs57.4
CRESTONSubstation-Adjacent161 kV100 MW4.3 yrs57.3
EC Near Summit LakeGreenfield——4.3 yrs57.2
EC Near Summit LakeGreenfield——4.3 yrs56.8
EC Near Summit LakeGreenfield——4.3 yrs56.3
UNKNOWN159164Substation-Adjacent69 kV50 MW4.3 yrs55.0
TAP159165Substation-Adjacent69 kV50 MW4.3 yrs54.2

Every scored site in Union

All 14 sites, best first.

Union datacenter FAQ

How many datacenter sites are in Union?

14 scored datacenter candidate sites, averaging 57.0/100 DC Readiness. That is the 49th-most of 85 Iowa counties with five or more sites.

What is the highest-scoring datacenter site in Union?

OZ Union scores 58.3/100 DC Readiness, the highest of the 14 scored sites in Union (a greenfield site).

Does Union offer datacenter tax incentives?

Sales tax exemption on DC equipment for $1M+ investments; property tax phase-in for new construction.

What is the natural-hazard risk in Union?

FEMA's National Risk Index rates Union as "Relatively Moderate" (score 30).

What are industrial electricity rates in Union?

Average industrial electricity is 8.19¢/kWh and commercial is 13.42¢/kWh in Union.

More in Iowa

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Union, Iowa”, https://gridcensus.com/datacenter-sites/iowa/union (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Union, Iowa is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.