Datacenter Sites in Macoupin, Illinois

Macoupin has 9 scored datacenter candidate sites averaging 55.1/100 DC Readiness, with a catalogued aggregate of 200 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Macoupin, Illinois has 9 scored datacenter candidate sites averaging 55.1/100 DC Readiness, roughly in line with the Illinois average of 53.6. It ranks 78th of 101 Illinois counties by number of sites and 31st by average score. The top-scoring site is EC Coal Macoupin County · 5176ec4b at 59.7/100.

9
Candidate sites
55.1/100
Avg DC Readiness
200 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 9 in Macoupin

Site-selection context for Macoupin

Yessales_tax_exemption
Datacenter tax incentive
8.92¢/kWh
Commercial electricity
3.58¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$8,862
Land price / acre
1,100
Cooling degree days
5,600
Heating degree days
52°F
Mean annual temp

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

How does Macoupin compare with other counties in Illinois?

By number of scored sites, Macoupin ranks 78th of the 101 Illinois counties with a county page, holding 0.2% of the state's 3,641 sites. Its average DC Readiness of 55.1/100 ranks 31st in the state and is roughly in line with the national average of 53.0. Nationally it has the 2493rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 6 score 55 or higher.

What types of datacenter sites are in Macoupin?

Greenfield sites are the most common (5, 56% of the county's inventory), followed by substation-adjacent (2) and former mine (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Macoupin?

Industrial electricity averages 3.58¢/kWh and commercial 8.92¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (35). WRI water stress is low. 6 fiber providers report service in the county. The climate runs 1,100 cooling degree days a year with a mean temperature of 52°F. Land is valued around $8,862 an acre.

By site type

Top datacenter sites in Macoupin

Top datacenter sites in Macoupin
SiteTypeVoltageCapacityQueue waitScore
EC Coal Macoupin CountyGreenfield——4.8 yrs59.7
UNKNOWN122515Substation-Adjacent138 kV100 MW4.8 yrs57.1
EC Coal Macoupin CountyGreenfield——4.8 yrs57.1
UNKNOWN122689Substation-Adjacent138 kV100 MW4.8 yrs56.4
OZ MacoupinGreenfield——4.8 yrs56.3
EC Coal Macoupin CountyGreenfield——4.8 yrs56.1
EC Coal Macoupin CountyGreenfield——4.8 yrs52.3
Mine SiteFormer Mine——4.8 yrs50.9
Mine SiteFormer Mine——4.8 yrs50.1

Every scored site in Macoupin

All 9 sites, best first.

Macoupin datacenter FAQ

How many datacenter sites are in Macoupin?

9 scored datacenter candidate sites, averaging 55.1/100 DC Readiness. That is the 78th-most of 101 Illinois counties with five or more sites.

What is the highest-scoring datacenter site in Macoupin?

EC Coal Macoupin County · 5176ec4b scores 59.7/100 DC Readiness, the highest of the 9 scored sites in Macoupin (a greenfield site).

Does Macoupin offer datacenter tax incentives?

Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

What is the natural-hazard risk in Macoupin?

FEMA's National Risk Index rates Macoupin as "Relatively High" (score 35).

What are industrial electricity rates in Macoupin?

Average industrial electricity is 3.58¢/kWh and commercial is 8.92¢/kWh in Macoupin.

More in Illinois

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Macoupin, Illinois”, https://gridcensus.com/datacenter-sites/illinois/macoupin (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Macoupin, Illinois is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.