Bonner County has 54 scored datacenter candidate sites averaging 51.7/100 DC Readiness, with a catalogued aggregate of 2,050 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.
At a glance
Bonner County, Idaho has 54 scored datacenter candidate sites averaging 51.7/100 DC Readiness, roughly in line with the Idaho average of 51.7. It ranks 13th of 43 Idaho counties by number of sites and 26th by average score. The top-scoring site is CABINET GORGE at 59.8/100.
Site-selection context for Bonner County
Incentive detail: Personal property tax exemption on computer equipment.
How does Bonner County compare with other counties in Idaho?
By number of scored sites, Bonner County ranks 13th of the 43 Idaho counties with a county page, holding 2.5% of the state's 2,171 sites. Its average DC Readiness of 51.7/100 ranks 26th in the state and is roughly in line with the national average of 53.0. Nationally it has the 695th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 18 score 55 or higher.
What types of datacenter sites are in Bonner County?
Industrial sites are the most common (24, 44% of the county's inventory), followed by substation-adjacent (19) and former mine (9). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Bonner County?
Industrial electricity averages 7.22¢/kWh and commercial 10.65¢/kWh. FEMA's National Risk Index rates the county "Relatively Low" (15). WRI water stress is medium-high. 8 fiber providers report service in the county. The climate runs 500 cooling degree days a year with a mean temperature of 44°F. Land is valued around $6,142 an acre.
By site type
Top datacenter sites in Bonner County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| CABINET GORGE | Substation-Adjacent | 230 kV | 300 MW | 5.0 yrs | 59.8 |
| EC FFE Bonner County | Greenfield | — | — | 5.0 yrs | 58.9 |
| TAP204953 | Substation-Adjacent | 115 kV | 100 MW | 5.0 yrs | 55.9 |
| TAP207705 | Substation-Adjacent | 115 kV | 100 MW | 5.0 yrs | 55.4 |
| UNKNOWN205027 | Substation-Adjacent | 115 kV | 100 MW | 5.0 yrs | 55.4 |
| LACLEDE | Substation-Adjacent | 115 kV | 100 MW | 5.0 yrs | 55.4 |
| TAP207655 | Substation-Adjacent | 115 kV | 100 MW | 5.0 yrs | 55.4 |
| TAP203501 | Substation-Adjacent | 115 kV | 100 MW | 5.0 yrs | 55.4 |
| UNKNOWN202310 | Substation-Adjacent | 115 kV | 100 MW | 5.0 yrs | 55.4 |
| TAP203498 | Substation-Adjacent | 115 kV | 100 MW | 5.0 yrs | 55.4 |
| SAMUELS | Substation-Adjacent | 115 kV | 100 MW | 5.0 yrs | 55.4 |
| SELLE | Substation-Adjacent | 115 kV | 100 MW | 5.0 yrs | 55.4 |
| UNKNOWN204957 | Substation-Adjacent | 115 kV | 100 MW | 5.0 yrs | 55.4 |
| ALBENI FALLS | Substation-Adjacent | 115 kV | 100 MW | 5.0 yrs | 55.4 |
| TAP203500 | Substation-Adjacent | 115 kV | 100 MW | 5.0 yrs | 55.4 |
| TAP203502 | Substation-Adjacent | 115 kV | 100 MW | 5.0 yrs | 55.3 |
| BRONX | Substation-Adjacent | 115 kV | 100 MW | 5.0 yrs | 55.3 |
| PRIEST RIVER | Substation-Adjacent | 115 kV | 100 MW | 5.0 yrs | 55.2 |
| UNKNOWN207703 | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 53.9 |
| UNKNOWN207658 | Substation-Adjacent | 69 kV | 50 MW | 5.0 yrs | 53.4 |
| Mine Site | Former Mine | — | — | 5.0 yrs | 50.0 |
| POBT Zone 4, Property 13, PSRC, Tax 47 | Industrial | — | — | 5.0 yrs | 49.5 |
| POBT Zone 4, PSRC, Martin property | Industrial | — | — | 5.0 yrs | 49.5 |
| Alpine Lumber Supply | Industrial | — | — | 5.0 yrs | 49.5 |
| POBT Zone 2, Property 6, Beach Shacks, Lots 1,2,3 | Industrial | — | — | 5.0 yrs | 49.5 |
Every scored site in Bonner County
All 54 sites, best first.
- CABINET GORGE · 59.8
- EC FFE Bonner County · 58.9
- Substation-Adjacent site · d8f63c74 · 55.9
- ALBENI FALLS · 55.4
- Substation-Adjacent site · f3fdb7fa · 55.4
- Substation-Adjacent site · 9b426613 · 55.4
- Substation-Adjacent site · 50c2ffcd · 55.4
- Substation-Adjacent site · 7192283f · 55.4
- SELLE · 55.4
- LACLEDE · 55.4
- SAMUELS · 55.4
- Substation-Adjacent site · abb90a3c · 55.4
- Substation-Adjacent site · d5b7eb9b · 55.4
- Substation-Adjacent site · b4534b33 · 55.4
- Substation-Adjacent site · df4a18ec · 55.4
- Substation-Adjacent site · 5430047a · 55.3
- BRONX · 55.3
- PRIEST RIVER · 55.2
- Substation-Adjacent site · 291824ce · 53.9
- Substation-Adjacent site · 0aee039f · 53.4
- Mine Site · 5180e258 · 50.0
- POBT Zone 1, Property 3, Humbird Mill Landing, Lot 2A · 49.5
- POBT Zone 1, Humbird Mill Landing Site Replat · 49.5
- Dalby's Signal Station · 49.5
- POBT Zone 2, Property 7, Beach Shacks, BNSF Railway Co., Right-of-Way · 49.5
- POBT Zone 4, Property 12, PSRC, Tax 90 · 49.5
- POBT Zone 4, Property 13, PSRC, Tax 47 · 49.5
- POBT Zone 1, Property 2, Humbird Mill Landing, Lot 2 · 49.5
- POBT Zone 2, Property 6, Beach Shacks, Lots 1,2,3 · 49.5
- POBT Zone 4, PSRC, Martin property · 49.5
- POBT Zone 3, Property 10, Coal Dock, BNSF Railway Co., Right-of-Way · 49.5
- POBTZone 1 Humbird Mill 1A · 49.5
- Alpine Lumber Supply · 49.5
- POBT Zone 5, Property 18, Tax 69, Tax 70 Less Tax 83 · 49.5
- Kraly Property · 49.5
- Dover Post Office · 49.5
- POBT Zone 4, Property 14, PSRC, Tax 91 · 49.5
- POBT Zone 4, Property 15, PSRC, BNSF Railway Co., Right-of-Way · 49.5
- POBT Zone 3, Property 9, Coal Dock, BNSF Railway Co., Right-of-Way · 49.5
- POBT Zone 1, Property 5, Humbird Mill Landing, BNSF Railway Co., Right-of-Way · 49.5
- POBT Zone 3 Coal Dock Site, Dann Hall · 49.5
- Mine Site · 41b427ed · 49.4
- Sandpoint Charter School · 49.4
- Mine Site · 2be52447 · 49.4
- Priest River Landfill · 49.4
- JD Lumber · 49.4
- Mine Site · 64f8f54f · 49.4
- Mine Site · bb7c4415 · 49.4
- Mine Site · 4ee92648 · 49.4
- POBT Zone 5, Property 16, Tax 83, Bonner County Historical Society · 49.4
- Mine Site · 8b545265 · 49.1
- Mine Site · f5fac048 · 49.0
- Mine Site · 0c3e447d · 48.9
- East Region · 9a7aefe4 · 48.8
Bonner County datacenter FAQ
How many datacenter sites are in Bonner County?
54 scored datacenter candidate sites, averaging 51.7/100 DC Readiness. That is the 13th-most of 43 Idaho counties with five or more sites.
What is the highest-scoring datacenter site in Bonner County?
CABINET GORGE scores 59.8/100 DC Readiness, the highest of the 54 scored sites in Bonner County (a substation-adjacent site).
Does Bonner County offer datacenter tax incentives?
Personal property tax exemption on computer equipment.
What is the natural-hazard risk in Bonner County?
FEMA's National Risk Index rates Bonner County as "Relatively Low" (score 15).
What are industrial electricity rates in Bonner County?
Average industrial electricity is 7.22¢/kWh and commercial is 10.65¢/kWh in Bonner County.
More in Idaho
- All datacenter sites in Idaho· 2,171 sites
- Operating datacenters in Idaho
- Electric substations in Idaho
- Bingham County· 210 sites · avg 50.8
- Valley County· 205 sites · avg 47.9
- Bonneville County· 158 sites · avg 51.1
- Power County· 148 sites · avg 50.7
- Canyon County· 146 sites · avg 54.0
- Ada County· 129 sites · avg 56.5
- Industrial sites in Idaho
- Substation-Adjacent sites in Idaho
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Bonner County, Idaho”, https://gridcensus.com/datacenter-sites/idaho/bonner-county (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Bonner County, Idaho is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.