Drew has 10 scored datacenter candidate sites averaging 51.9/100 DC Readiness, with a catalogued aggregate of 600 MW. FEMA rates local natural-hazard risk as "Relatively High".

At a glance

Drew, Arkansas has 10 scored datacenter candidate sites averaging 51.9/100 DC Readiness, roughly in line with the Arkansas average of 53.6. It ranks 53rd of 74 Arkansas counties by number of sites and 51st by average score. The top-scoring site is OZ Drew · 668e51f3 at 55.8/100.

10
Candidate sites
51.9/100
Avg DC Readiness
600 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 10 in Drew

Site-selection context for Drew

No
Datacenter tax incentive
11.34¢/kWh
Commercial electricity
7.85¢/kWh
Industrial electricity
3
Fiber providers
Low
Water stress
$3,711
Land price / acre
1,900
Cooling degree days
3,400
Heating degree days
60°F
Mean annual temp

How does Drew compare with other counties in Arkansas?

By number of scored sites, Drew ranks 53rd of the 74 Arkansas counties with a county page, holding 0.6% of the state's 1,651 sites. Its average DC Readiness of 51.9/100 ranks 51st in the state and is roughly in line with the national average of 53.0. Nationally it has the 2409th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 1 score 55 or higher.

What types of datacenter sites are in Drew?

Substation-Adjacent sites are the most common (5, 50% of the county's inventory), followed by greenfield (4) and federal excess (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Drew?

Industrial electricity averages 7.85¢/kWh and commercial 11.34¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (38). WRI water stress is low. 3 fiber providers report service in the county. The climate runs 1,900 cooling degree days a year with a mean temperature of 60°F. Land is valued around $3,711 an acre.

By site type

Top datacenter sites in Drew

Top datacenter sites in Drew
SiteTypeVoltageCapacityQueue waitScore
OZ DrewGreenfield——4.3 yrs55.8
MONTICELLO EASTSubstation-Adjacent115 kV100 MW4.3 yrs53.3
UNKNOWN107950Substation-Adjacent115 kV100 MW4.3 yrs53.3
UNKNOWN108009Substation-Adjacent115 kV100 MW4.3 yrs53.2
UNKNOWN108011Substation-Adjacent115 kV100 MW4.3 yrs53.2
LACEYSubstation-Adjacent115 kV100 MW4.3 yrs52.4
EC FFE Drew CountyGreenfield——4.3 yrs52.1
OZ DrewGreenfield——4.3 yrs51.2
MONTICELLO, ARFederal Excess——4.3 yrs47.8
Greenfield (MONTICELLO EAST - LACEY)Greenfield115 kV100 MW4.3 yrs46.6

Every scored site in Drew

All 10 sites, best first.

Drew datacenter FAQ

How many datacenter sites are in Drew?

10 scored datacenter candidate sites, averaging 51.9/100 DC Readiness. That is the 53rd-most of 74 Arkansas counties with five or more sites.

What is the highest-scoring datacenter site in Drew?

OZ Drew · 668e51f3 scores 55.8/100 DC Readiness, the highest of the 10 scored sites in Drew (a greenfield site).

Does Drew offer datacenter tax incentives?

No datacenter-specific tax incentive is on record for Drew in the GridCensus county dataset.

What is the natural-hazard risk in Drew?

FEMA's National Risk Index rates Drew as "Relatively High" (score 38).

What are industrial electricity rates in Drew?

Average industrial electricity is 7.85¢/kWh and commercial is 11.34¢/kWh in Drew.

More in Arkansas

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Drew, Arkansas”, https://gridcensus.com/datacenter-sites/arkansas/drew (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Drew, Arkansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.