Datacenter Sites in Haines County, Alaska

Haines County has 9 scored datacenter candidate sites averaging 49.6/100 DC Readiness, with a catalogued aggregate of 2 MW. FEMA rates local natural-hazard risk as "Relatively Low".

At a glance

Haines County, Alaska has 9 scored datacenter candidate sites averaging 49.6/100 DC Readiness, roughly in line with the Alaska average of 50.3. It ranks 22nd of 29 Alaska counties by number of sites and 10th by average score. The top-scoring site is HAINES · 582b243a at 50.7/100.

9
Candidate sites
49.6/100
Avg DC Readiness
2 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 9 in Haines County

Site-selection context for Haines County

No
Datacenter tax incentive
31.31¢/kWh
Commercial electricity
—
Industrial electricity
1
Fiber providers
Low
Water stress
$20,972
Land price / acre
0
Cooling degree days
10,000
Heating degree days
27°F
Mean annual temp

How does Haines County compare with other counties in Alaska?

By number of scored sites, Haines County ranks 22nd of the 29 Alaska counties with a county page, holding 1.1% of the state's 817 sites. Its average DC Readiness of 49.6/100 ranks 10th in the state and is roughly in line with the national average of 53.0. Nationally it has the 2493rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 0 score 55 or higher.

What types of datacenter sites are in Haines County?

Former Mine sites are the most common (6, 67% of the county's inventory), followed by brownfield (1) and greenfield (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Haines County?

FEMA's National Risk Index rates the county "Relatively Low" (18). WRI water stress is low. 1 fiber providers report service in the county. The climate runs 0 cooling degree days a year with a mean temperature of 27°F. Land is valued around $20,972 an acre.

By site type

Top datacenter sites in Haines County

Top datacenter sites in Haines County
SiteTypeVoltageCapacityQueue waitScore
HAINESFederal Excess——3.9 yrs50.7
Mine SiteFormer Mine——4.3 yrs50.7
HainesBrownfield—2 MW4.3 yrs50.6
Mine SiteFormer Mine——4.3 yrs50.5
Mine SiteFormer Mine——4.3 yrs49.2
OZ HainesGreenfield——4.3 yrs49.1
Mine SiteFormer Mine——4.3 yrs48.6
Mine SiteFormer Mine——4.3 yrs48.6
Mine SiteFormer Mine——4.3 yrs48.0

Every scored site in Haines County

All 9 sites, best first.

Haines County datacenter FAQ

How many datacenter sites are in Haines County?

9 scored datacenter candidate sites, averaging 49.6/100 DC Readiness. That is the 22nd-most of 29 Alaska counties with five or more sites.

What is the highest-scoring datacenter site in Haines County?

HAINES · 582b243a scores 50.7/100 DC Readiness, the highest of the 9 scored sites in Haines County (a federal excess site).

Does Haines County offer datacenter tax incentives?

No datacenter-specific tax incentive is on record for Haines County in the GridCensus county dataset.

What is the natural-hazard risk in Haines County?

FEMA's National Risk Index rates Haines County as "Relatively Low" (score 18).

More in Alaska

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Haines County, Alaska”, https://gridcensus.com/datacenter-sites/alaska/haines-county (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Haines County, Alaska is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.