Datacenter Sites in Denali Borough, Alaska

Denali Borough has 21 scored datacenter candidate sites averaging 50.3/100 DC Readiness, with a catalogued aggregate of 500 MW. FEMA rates local natural-hazard risk as "Relatively Low".

At a glance

Denali Borough, Alaska has 21 scored datacenter candidate sites averaging 50.3/100 DC Readiness, roughly in line with the Alaska average of 50.3. It ranks 12th of 29 Alaska counties by number of sites and 7th by average score. The top-scoring site is Substation-Adjacent site · 0416952f at 56.3/100.

21
Candidate sites
50.3/100
Avg DC Readiness
500 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 21 in Denali Borough

Site-selection context for Denali Borough

No
Datacenter tax incentive
29.15¢/kWh
Commercial electricity
21.90¢/kWh
Industrial electricity
1
Fiber providers
Low
Water stress
$20,972
Land price / acre
0
Cooling degree days
10,000
Heating degree days
27°F
Mean annual temp

How does Denali Borough compare with other counties in Alaska?

By number of scored sites, Denali Borough ranks 12th of the 29 Alaska counties with a county page, holding 2.6% of the state's 817 sites. Its average DC Readiness of 50.3/100 ranks 7th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1665th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 4 score 55 or higher.

What types of datacenter sites are in Denali Borough?

Former Mine sites are the most common (15, 71% of the county's inventory), followed by substation-adjacent (5) and greenfield (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Denali Borough?

Industrial electricity averages 21.90¢/kWh and commercial 29.15¢/kWh. FEMA's National Risk Index rates the county "Relatively Low" (18). WRI water stress is low. 1 fiber providers report service in the county. The climate runs 0 cooling degree days a year with a mean temperature of 27°F. Land is valued around $20,972 an acre.

By site type

Top datacenter sites in Denali Borough

Top datacenter sites in Denali Borough
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN158493Substation-Adjacent138 kV100 MW4.3 yrs56.3
UNKNOWN158473Substation-Adjacent138 kV100 MW4.3 yrs56.2
UNKNOWN158456Substation-Adjacent138 kV100 MW4.3 yrs55.6
UNKNOWN158457Substation-Adjacent138 kV100 MW4.3 yrs55.4
UNKNOWN173493Substation-Adjacent138 kV100 MW4.3 yrs54.9
Mine SiteFormer Mine——4.3 yrs49.3
Mine SiteFormer Mine——4.3 yrs49.3
Mine SiteFormer Mine——4.3 yrs49.3
Mine SiteFormer Mine——4.3 yrs49.3
Mine SiteFormer Mine——4.3 yrs49.2
Mine SiteFormer Mine——4.3 yrs49.1
Mine SiteFormer Mine——4.3 yrs48.9
Mine SiteFormer Mine——4.3 yrs48.8
Mine SiteFormer Mine——4.3 yrs48.7
Mine SiteFormer Mine——4.3 yrs48.7
Mine SiteFormer Mine——4.3 yrs48.7
Mine SiteFormer Mine——4.3 yrs48.7
Mine SiteFormer Mine——4.3 yrs48.2
Mine SiteFormer Mine——4.3 yrs48.2
Mine SiteFormer Mine——4.3 yrs47.2
EC FFE Denali BoroughGreenfield——4.3 yrs45.6

Every scored site in Denali Borough

All 21 sites, best first.

Denali Borough datacenter FAQ

How many datacenter sites are in Denali Borough?

21 scored datacenter candidate sites, averaging 50.3/100 DC Readiness. That is the 12th-most of 29 Alaska counties with five or more sites.

What is the highest-scoring datacenter site in Denali Borough?

Substation-Adjacent site · 0416952f scores 56.3/100 DC Readiness, the highest of the 21 scored sites in Denali Borough (a substation-adjacent site).

Does Denali Borough offer datacenter tax incentives?

No datacenter-specific tax incentive is on record for Denali Borough in the GridCensus county dataset.

What is the natural-hazard risk in Denali Borough?

FEMA's National Risk Index rates Denali Borough as "Relatively Low" (score 18).

What are industrial electricity rates in Denali Borough?

Average industrial electricity is 21.90¢/kWh and commercial is 29.15¢/kWh in Denali Borough.

More in Alaska

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Denali Borough, Alaska”, https://gridcensus.com/datacenter-sites/alaska/denali-borough (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Denali Borough, Alaska is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.