Aleutians East has 7 scored datacenter candidate sites averaging 43.8/100 DC Readiness, with a catalogued aggregate of 1 MW. FEMA rates local natural-hazard risk as "Relatively Low".

At a glance

Aleutians East, Alaska has 7 scored datacenter candidate sites averaging 43.8/100 DC Readiness, about 13% below the Alaska average of 50.3. It ranks 23rd of 29 Alaska counties by number of sites and 28th by average score. The top-scoring site is COLD BAY · 5291197a at 47.3/100.

7
Candidate sites
43.8/100
Avg DC Readiness
1 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 7 in Aleutians East

Site-selection context for Aleutians East

No
Datacenter tax incentive
—
Commercial electricity
—
Industrial electricity
1
Fiber providers
Low
Water stress
$20,972
Land price / acre
0
Cooling degree days
10,000
Heating degree days
27°F
Mean annual temp

How does Aleutians East compare with other counties in Alaska?

By number of scored sites, Aleutians East ranks 23rd of the 29 Alaska counties with a county page, holding 0.9% of the state's 817 sites. Its average DC Readiness of 43.8/100 ranks 28th in the state and is about 17% below the national average of 53.0. Nationally it has the 2670th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 0 score 55 or higher.

What types of datacenter sites are in Aleutians East?

Federal Excess sites are the most common (3, 43% of the county's inventory), followed by greenfield (2) and former mine (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Aleutians East?

FEMA's National Risk Index rates the county "Relatively Low" (18). WRI water stress is low. 1 fiber providers report service in the county. The climate runs 0 cooling degree days a year with a mean temperature of 27°F. Land is valued around $20,972 an acre.

By site type

Top datacenter sites in Aleutians East

Top datacenter sites in Aleutians East
SiteTypeVoltageCapacityQueue waitScore
COLD BAYFederal Excess——3.9 yrs47.3
COLD BAY AIRPORT RW 32Federal Excess——3.9 yrs47.2
COLD BAY RWY 14Federal Excess——3.9 yrs47.1
Mine SiteFormer Mine——4.3 yrs45.8
Dutch HarborBrownfield—1 MW4.3 yrs42.4
OZ Aleutians EastGreenfield——4.3 yrs38.8
EC FFE Aleutians East BoroughGreenfield——4.3 yrs37.9

Every scored site in Aleutians East

All 7 sites, best first.

Aleutians East datacenter FAQ

How many datacenter sites are in Aleutians East?

7 scored datacenter candidate sites, averaging 43.8/100 DC Readiness. That is the 23rd-most of 29 Alaska counties with five or more sites.

What is the highest-scoring datacenter site in Aleutians East?

COLD BAY · 5291197a scores 47.3/100 DC Readiness, the highest of the 7 scored sites in Aleutians East (a federal excess site).

Does Aleutians East offer datacenter tax incentives?

No datacenter-specific tax incentive is on record for Aleutians East in the GridCensus county dataset.

What is the natural-hazard risk in Aleutians East?

FEMA's National Risk Index rates Aleutians East as "Relatively Low" (score 18).

More in Alaska

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Aleutians East, Alaska”, https://gridcensus.com/datacenter-sites/alaska/aleutians-east (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Aleutians East, Alaska is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.