Spartanburg Water System

Brownfield

Chesnee, Spartanburg, South Carolina · Spartanburg Commissioners PW

Legacy capacity
3
MW

Spartanburg Water System is a oil plant in Chesnee, Spartanburg, South Carolina, retired 2021-02-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity3 MW
Retirement date2021-02-01
EIA plant ID#54675

Grid hookup & remediation

Nearest substation0.1 mi
Operator address390 Spartanburg Water Works Rd, Chesnee, SC, 29323
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Spartanburg Water System, ranked by DC Readiness.

Candidate sites near Spartanburg Water System
SiteTypeStateCountyVoltageCapacityQueue waitScore
PEACH VALLEY TIESubstation-AdjacentSCSpartanburg County230 kV300 MW1.0 yrs67.2
TIGER TIESubstation-AdjacentSCSpartanburg County230 kV300 MW1.0 yrs67.2
OZ SpartanburgGreenfieldSCSpartanburg3.7 yrs66.8
EC Near Enoree Phase II Landfill Gas RecoveryGreenfieldSCGreenville3.7 yrs66.4
UNKNOWN111316Substation-AdjacentNCCleveland County500 kV1,000 MW3.8 yrs65.8
UNKNOWN114030Substation-AdjacentSCGreenville County100 kV50 MW1.0 yrs64.0
UNKNOWN114031Substation-AdjacentSCGreenville County100 kV50 MW1.0 yrs64.0
DEADEND167235Substation-AdjacentSCGreenville County100 kV50 MW1.0 yrs63.9

Nearby internet exchanges

See all datacenter sites in South Carolina

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.