Enoree Phase II Landfill Gas Recovery
BrownfieldGreer, Greenville, South Carolina · Enerdyne Power Systems Inc
Enoree Phase II Landfill Gas Recovery is a natural gas plant in Greer, Greenville, South Carolina, retired 2024-07-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Enoree Phase II Landfill Gas Recovery, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TIGER TIE | Substation-Adjacent | SC | Spartanburg County | 230 kV | 300 MW | 3.7 yrs | 75.4 |
| NORTH GREENVILLE TIE | Substation-Adjacent | SC | Greenville County | 230 kV | 300 MW | 3.7 yrs | 72.3 |
| Greenfield (UNKNOWN111199 - JOCASSEE TIE) | Greenfield | NC | Polk County | 500 kV | 1,000 MW | 3.7 yrs | 71.1 |
| Greenfield (TIGER TIE - PEACH VALLEY TIE) | Greenfield | SC | Spartanburg County | 230 kV | 300 MW | 3.7 yrs | 71.0 |
| Greenfield (UNKNOWN111199 - JOCASSEE TIE) | Greenfield | SC | Greenville County | 500 kV | 1,000 MW | 3.7 yrs | 69.8 |
| EAST SPARTANBURG | Substation-Adjacent | SC | Spartanburg County | 100 kV | 50 MW | 3.7 yrs | 69.7 |
| UNKNOWN115052 | Substation-Adjacent | SC | Spartanburg County | 100 kV | 50 MW | 3.7 yrs | 69.6 |
| UNKNOWN170226 | Substation-Adjacent | SC | Spartanburg County | 100 kV | 50 MW | 3.7 yrs | 69.5 |
Nearby internet exchanges
- DartPoints Spartanburg, SC - SPA1Spartanburg, SC · 4 networks
- DartPoints Greenville, SC - GSP1Greenville, SC · 3 networks
- DC BLOX GSP1 - DCBLOX GreenvilleGreenville, SC · 2 networks
- CloudOgreMill Spring, NC · 0 networks
See all datacenter sites in South Carolina →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Enoree Phase II Landfill Gas Recovery, Greer, Greenville, South Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.