Central Plant
BrownfieldGreenville, GREENVILLE, South Carolina · Bob Jones University
Central Plant is a natural gas plant in Greenville, GREENVILLE, South Carolina, retired 2016-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Central Plant, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TIGER TIE | Substation-Adjacent | SC | Spartanburg County | 230 kV | 300 MW | 3.7 yrs | 75.4 |
| NORTH GREENVILLE TIE | Substation-Adjacent | SC | Greenville County | 230 kV | 300 MW | 3.7 yrs | 72.3 |
| Greenfield (UNKNOWN111199 - JOCASSEE TIE) | Greenfield | NC | Polk County | 500 kV | 1,000 MW | 3.7 yrs | 71.1 |
| Greenfield (TIGER TIE - PEACH VALLEY TIE) | Greenfield | SC | Spartanburg County | 230 kV | 300 MW | 3.7 yrs | 71.0 |
| Greenfield (UNKNOWN111199 - JOCASSEE TIE) | Greenfield | SC | Greenville County | 500 kV | 1,000 MW | 3.7 yrs | 69.8 |
| Greenfield (UNKNOWN111199 - JOCASSEE TIE) | Greenfield | NC | Polk County | 500 kV | 1,000 MW | 3.7 yrs | 69.1 |
| SHILOH SWITCHING STATION | Substation-Adjacent | SC | Pickens County | 230 kV | 300 MW | 3.7 yrs | 69.0 |
| UNKNOWN170138 | Substation-Adjacent | SC | Greenville County | 100 kV | 50 MW | 3.7 yrs | 68.6 |
Nearby internet exchanges
- DartPoints Spartanburg, SC - SPA1Spartanburg, SC · 4 networks
- DartPoints Greenville, SC - GSP1Greenville, SC · 3 networks
- DC BLOX GSP1 - DCBLOX GreenvilleGreenville, SC · 2 networks
- CloudOgreMill Spring, NC · 0 networks
See all datacenter sites in South Carolina →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Central Plant, Greenville, GREENVILLE, South Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.