James E. Rogers Energy Complex is a coal plant in Cliffside, Cleveland, North Carolina, retired 2011-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1,010 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near James E. Rogers Energy Complex, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TIGER TIE | Substation-Adjacent | SC | Spartanburg County | 230 kV | 300 MW | 1.0 yrs | 67.2 |
| PEACH VALLEY TIE | Substation-Adjacent | SC | Spartanburg County | 230 kV | 300 MW | 1.0 yrs | 67.2 |
| OZ Spartanburg | Greenfield | SC | Spartanburg | — | — | 3.7 yrs | 66.8 |
| RIPP SWITCHING STATION | Substation-Adjacent | SC | Cherokee County | 230 kV | 300 MW | 1.0 yrs | 66.1 |
| UNKNOWN111316 | Substation-Adjacent | NC | Cleveland County | 500 kV | 1,000 MW | 3.8 yrs | 65.8 |
| UNKNOWN133860 | Substation-Adjacent | NC | Cherokee County | 230 kV | 300 MW | 3.8 yrs | 64.4 |
| RIVERVIEW SWITCHING STATION | Substation-Adjacent | SC | Cherokee County | 230 kV | 300 MW | 1.0 yrs | 63.4 |
| INMAN | Substation-Adjacent | SC | Spartanburg County | 100 kV | 50 MW | 1.0 yrs | 63.3 |
Nearby internet exchanges
- DartPoints Spartanburg, SC - SPA1Spartanburg, SC · 4 networks
- DartPoints Greenville, SC - GSP1Greenville, SC · 3 networks
- DC BLOX GSP1 - DCBLOX GreenvilleGreenville, SC · 2 networks
- T5@CharlotteKings Mountain, NC · 0 networks
See all datacenter sites in North Carolina →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for James E. Rogers Energy Complex, Cliffside, Cleveland, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.