Cleveland Cnty Generating Facility
BrownfieldKings Mountain, Cleveland, North Carolina · Southern Power Co
Cleveland Cnty Generating Facility is a natural gas plant in Kings Mountain, Cleveland, North Carolina. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 736 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Cleveland Cnty Generating Facility, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN111199 | Substation-Adjacent | NC | Cleveland County | 500 kV | 1,000 MW | 3.7 yrs | 79.9 |
| JAMES E. ROGERS ENERGY COMPLEX | Substation-Adjacent | NC | Cleveland County | 500 kV | 1,000 MW | 3.7 yrs | 77.6 |
| PACOLET TIE | Substation-Adjacent | SC | Cherokee County | 230 kV | 300 MW | 3.7 yrs | 74.7 |
| CLEVELAND CNTY GENERATING FACILITY | Substation-Adjacent | SC | Cherokee County | 230 kV | 300 MW | 4.3 yrs | 74.3 |
| SHELBY TIE | Substation-Adjacent | NC | Cleveland County | 230 kV | 300 MW | 3.7 yrs | 73.9 |
| Greenfield (UNKNOWN111199 - MCGUIRE) | Greenfield | NC | Gaston County | 500 kV | 1,000 MW | 3.7 yrs | 73.5 |
| Greenfield (UNKNOWN111199 - MCGUIRE) | Greenfield | NC | Gaston County | 500 kV | 1,000 MW | 3.7 yrs | 73.0 |
| James E. Rogers Energy Complex | Brownfield | NC | Rutherford | — | 1,010 MW | — | 71.9 |
Nearby internet exchanges
- Digital Realty CLT (113 N Myers St)Charlotte, NC · 13 networks
- CENTRA CLT01 - Charlotte NC (701 E Trade)Charlotte, NC · 8 networks
- CLT2Charlotte, NC · 7 networks
- Digital Realty CLT (125 N Myers St)Charlotte, NC · 6 networks
See all datacenter sites in North Carolina →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Cleveland Cnty Generating Facility, Kings Mountain, Cleveland, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.