UNKNOWN111199

Substation-Adjacent

Cleveland County, North Carolina · PJM

DC Readiness
64.4
Good / 100

UNKNOWN111199 is a substation-adjacent datacenter candidate site in Cleveland County, North Carolina, interconnecting through PJM. It screens at 64.4/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN111199
Substation distance0.0 mi
Substation voltage500 kV
Available capacity1,000 MW
UtilityDUKE ENERGY CAROLINAS, LLCinvestor ownedmoderate to large load · terms ≥ 100 MWLarge Load Customer terms (≥100 MW): minimum bills, contract demand · 10 yr

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth177
Avg queue wait3.8 yrs

Connectivity

Nearest IXPT5@Charlotte
IXP distance19.9 mi
Fiber providers5
Fiber coverage31.7%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score58/100

Location context

Nearest datacenterMeta Forest City datacenter
DC distance7.4 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.05¢/kWh
Industrial electricity7.86¢/kWh
Cooling degree days1,600
Heating degree days3,300
Land price / acre$6,086

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN111199

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
100
Speed to power20%
40
Fiber connectivity12%
68
Energy cost10%
50
Water risk7%
84
Natural hazard6%
58
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
45

Nearby comparable sites

Other scored datacenter candidate sites in Cleveland County, ranked by DC Readiness.

Sites near UNKNOWN111199
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN111316Substation-Adjacent500 kV1,000 MW3.8 yrs69.2
SHELBY TIESubstation-Adjacent230 kV300 MW3.8 yrs61.2
EC Coal Cleveland CountyGreenfield——4.3 yrs59.3
EC Near James E. Rogers Energy ComplexGreenfield——4.3 yrs58.3
EC Near Cleveland Cnty Generating FacilityGreenfield——4.3 yrs57.6
UNKNOWN111208Substation-Adjacent100 kV50 MW3.8 yrs56.6
EC Near Cleveland Cnty Generating FacilityGreenfield——4.3 yrs56.1
EC Near James E. Rogers Energy ComplexGreenfield——4.3 yrs56.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.