At a glance

TAP307903 is a 60 kV electric substation in California on PACIFIC GAS & ELECTRIC COMPANY's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is GATES in Kings County, with a DC Readiness score of 56/100.

TAP307903 is an electric transmission substation in California, on PACIFIC GAS & ELECTRIC COMPANY's transmission network. It is classified as distribution (<69 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage60 kV
Min voltage60 kV
Voltage classDistribution (<69 kV)
Connected lines3

Ownership

Line owner (most lines)PACIFIC GAS & ELECTRIC COMPANY
Coordinates36.2258, -119.7801

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#30707560 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE0.3 mi
#30719260 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE7.0 mi
#31170060 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE3.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP307903, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP307903 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GATESSubstation-AdjacentCAKings County500 kV1,000 MW7.6 yrs56.4
MCCALLSubstation-AdjacentCAFresno County230 kV300 MW7.6 yrs54.5
MC MULLINSubstation-AdjacentCAFresno County230 kV300 MW7.6 yrs53.9
HELMSubstation-AdjacentCAFresno County230 kV300 MW7.6 yrs53.6
Dinuba EnergyBrownfieldCAFresno County66 kV12 MW7.6 yrs53.1
UNKNOWN307522Substation-AdjacentCAFresno County230 kV300 MW7.6 yrs53.1
Fresno Cogen PartnersBrownfieldCAFresno County66 kV32 MW7.6 yrs53.0
HENRIETTASubstation-AdjacentCAKings County230 kV300 MW7.6 yrs52.0

Who owns the transmission lines at TAP307903?

The 3 connected lines listed above are owned by PACIFIC GAS & ELECTRIC COMPANY. Line voltages range from 60 kV to 60 kV. Their combined recorded length is about 10.3 miles.

How do candidate sites near TAP307903 score?

The 8 highest-scoring candidate sites within about 25 miles range from 52 to 56 on the 0–100 DC Readiness scale. They fall in Kings County, Fresno County. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP307903 substation?

TAP307903 has a maximum voltage of 60 kV. That places it in the below 69 kV band. The median named US substation in this dataset is 115 kV, so TAP307903 is below the national midpoint.

How many transmission lines connect to TAP307903 substation?

3 transmission lines terminate at or pass through TAP307903 in the HIFLD line data. The connected lines listed here run at 60 kV. Together the listed lines cover about 10.3 miles.

Who owns TAP307903 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP307903 belong to PACIFIC GAS & ELECTRIC COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP307903 substation located?

TAP307903 is in California at 36.2258, -119.7801. The datacenter candidate sites closest to it are in Kings County, Fresno County.

Are there datacenter candidate sites near TAP307903 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP307903. The highest-scoring is GATES at 56/100. Across California, the average DC Readiness score is 45.4.

More in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP307903 substation, California”, https://gridcensus.com/substations/california/tap307903-501010db (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP307903 substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.