GATES is a substation-adjacent datacenter candidate site in Kings County, California, interconnecting through CAISO. It screens at 55.8/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 8.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationGATES
Substation distance0.0 mi
Substation voltage500 kV
Available capacity1,000 MW
UtilityPACIFIC GAS & ELECTRIC CO.investor ownedrestrictive to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookConstrained
≈ 8.2 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionCAISO
Queue depth227
Avg queue wait8.2 yrs

Connectivity

Nearest IXPUnwired FAT1 - Fresno Colocation
IXP distance52.0 mi
Fiber providers5
Fiber coverage25.3%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score52/100

Location context

Nearest datacenterUnwired FAT1 - Fresno Colocation
DC distance52.0 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity25.32¢/kWh
Industrial electricity19.66¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$10,391

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track GATES

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
100
Speed to power20%
40
Fiber connectivity12%
57
Energy cost10%
50
Water risk7%
24
Natural hazard6%
52
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
34
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Kings County, ranked by DC Readiness.

Sites near GATES
SiteTypeVoltageCapacityQueue waitScore
Gates PeakerBrownfield66 kV47 MW5.7 yrs51.6
HENRIETTASubstation-Adjacent230 kV300 MW8.2 yrs51.4
ARCOSubstation-Adjacent230 kV300 MW8.2 yrs51.3
Lost Hills Cogeneration PlantBrownfield66 kV4 MW5.7 yrs50.8
UNKNOWN300573Substation-Adjacent230 kV300 MW8.2 yrs50.6
OZ KingsGreenfield——5.7 yrs49.5
Roll Lost HillsBrownfield—1 MW5.7 yrs48.5
City of Tulare Water FacilityBrownfield66 kV1 MW5.7 yrs47.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.