SJVE EL NIDO
SubstationCalifornia · PACIFIC GAS & ELECTRIC COMPANY
At a glance
SJVE EL NIDO is an electric transmission substation in California, on PACIFIC GAS & ELECTRIC COMPANY's transmission network. It is classified as distribution (<69 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #306518 | 60 kV | PACIFIC GAS & ELECTRIC COMPANY | IN SERVICE | 0.1 mi |
| #304143 | — | PACIFIC GAS & ELECTRIC COMPANY | IN SERVICE | 0.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of SJVE EL NIDO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| Turlock Irrigation District Fuel Cell | Brownfield | CA | Stanislaus County | 66 kV | 1 MW | 7.6 yrs | 55.9 |
| DOS AMIGOS | Substation-Adjacent | CA | Merced County | 230 kV | 300 MW | 7.6 yrs | 52.1 |
| WILSON | Substation-Adjacent | CA | Merced County | 230 kV | 300 MW | 7.6 yrs | 52.1 |
| SAN LUIS | Substation-Adjacent | CA | Merced County | 230 kV | 300 MW | 7.6 yrs | 51.9 |
| TAYLOR | Substation-Adjacent | CA | Stanislaus County | 115 kV | 100 MW | 7.6 yrs | 51.0 |
| OZ Stanislaus | Greenfield | CA | Stanislaus | — | — | 7.6 yrs | 50.4 |
| OZ Merced | Greenfield | CA | Merced | — | — | 7.6 yrs | 49.9 |
| OZ Merced | Greenfield | CA | Merced | — | — | 7.6 yrs | 49.8 |
How does SJVE EL NIDO compare with other substations in California?
California has 4,260 substation records in HIFLD, of which 3,003 carry a station name; the rest are unnamed tap points, risers and line ends. 1,439 named substations in the state are in SJVE EL NIDO's below 69 kV band (48% of named stations). 1,504 sit in a higher band. 44 named substations in California operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 69 kV.
Who owns the transmission lines at SJVE EL NIDO?
The 2 connected lines listed above are owned by PACIFIC GAS & ELECTRIC COMPANY. Line voltages range from 60 kV to 60 kV. Their combined recorded length is about 0.2 miles.
How do candidate sites near SJVE EL NIDO score?
The 8 highest-scoring candidate sites within about 25 miles range from 50 to 56 on the 0–100 DC Readiness scale. They fall in Stanislaus County, Merced County, Stanislaus, Merced. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is SJVE EL NIDO substation?
SJVE EL NIDO has a maximum voltage of 60 kV. That places it in the below 69 kV band. The median named US substation in this dataset is 115 kV, so SJVE EL NIDO is below the national midpoint.
How many transmission lines connect to SJVE EL NIDO substation?
2 transmission lines terminate at or pass through SJVE EL NIDO in the HIFLD line data. The connected lines listed here run at 60 kV. Together the listed lines cover about 0.2 miles.
Who owns SJVE EL NIDO substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at SJVE EL NIDO belong to PACIFIC GAS & ELECTRIC COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is SJVE EL NIDO substation located?
SJVE EL NIDO is in California at 37.1863, -120.4902. The datacenter candidate sites closest to it are in Stanislaus County, Merced County, Stanislaus.
Are there datacenter candidate sites near SJVE EL NIDO substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of SJVE EL NIDO. The highest-scoring is Turlock Irrigation District Fuel Cell at 56/100. Across California, the average DC Readiness score is 45.4.
Other 60 kV substations in California
- MENDOCINO· 8 lines
- MONTA VISTA· 7 lines
- HOPLAND· 6 lines
- LODI· 6 lines
- POSCO· 6 lines
- SUNOL TAP· 5 lines
- FRENCH CAMP· 4 lines
- HEALDSBURG· 4 lines
- All named substations in California· 3,003 stations
- Datacenter candidate sites in California· 8,490 sites
- Brownfield and retired plant sites in California
- Substations by state
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “SJVE EL NIDO substation, California”, https://gridcensus.com/substations/california/sjve-el-nido-f9a8a9cb (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for SJVE EL NIDO substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.