MENDOCINO

Substation

California · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
60
kV

At a glance

MENDOCINO is a 60 kV electric substation in California on PACIFIC GAS & ELECTRIC COMPANY's transmission network, recorded in the HIFLD transmission dataset. 8 transmission lines connect to it. 1,504 of California's 3,003 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is LUCERNE in Lake County, with a DC Readiness score of 47/100.

MENDOCINO is an electric transmission substation in California, on PACIFIC GAS & ELECTRIC COMPANY's transmission network. It is classified as distribution (<69 kv) and connects 8 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage60 kV
Min voltage60 kV
Voltage classDistribution (<69 kV)
Connected lines8

Ownership

Line owner (most lines)PACIFIC GAS & ELECTRIC COMPANY
Coordinates39.2506, -123.1964

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#304409115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE61.0 mi
#305077115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE24.2 mi
#312453115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE4.0 mi
#30644860 kVPACIFIC GAS & ELECTRIC COMPANY—18.0 mi
#31030260 kVPACIFIC GAS & ELECTRIC COMPANY—10.9 mi
#31094360 kVPACIFIC GAS & ELECTRIC COMPANY—14.5 mi
#30458260 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE30.9 mi
#31237260 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE14.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MENDOCINO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MENDOCINO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LUCERNESubstation-AdjacentCALake County115 kV100 MW7.6 yrs46.7
UKIAHSubstation-AdjacentCAMendocino County115 kV100 MW7.6 yrs46.1
CALPELLASubstation-AdjacentCAMendocino County115 kV100 MW7.6 yrs46.0
Trinity River Division, CVPFederal ExcessCALake County——7.6 yrs40.9
Mine SiteFormer MineCAMendocino County——7.6 yrs40.9
Mine SiteFormer MineCAMendocino County——7.6 yrs40.9
Hopland Rancheria Well 2001IndustrialCAMendocino County——7.6 yrs40.8
Hopland Pomo RancheriaIndustrialCAMendocino County——7.6 yrs40.8

How does MENDOCINO compare with other substations in California?

California has 4,260 substation records in HIFLD, of which 3,003 carry a station name; the rest are unnamed tap points, risers and line ends. 1,439 named substations in the state are in MENDOCINO's below 69 kV band (48% of named stations). 1,504 sit in a higher band. 44 named substations in California operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 69 kV.

Who owns the transmission lines at MENDOCINO?

The 8 connected lines listed above are owned by PACIFIC GAS & ELECTRIC COMPANY. Line voltages range from 60 kV to 115 kV. Their combined recorded length is about 177.5 miles.

How do candidate sites near MENDOCINO score?

The 8 highest-scoring candidate sites within about 25 miles range from 41 to 47 on the 0–100 DC Readiness scale. They fall in Lake County, Mendocino County. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is MENDOCINO substation?

MENDOCINO has a maximum voltage of 60 kV. That places it in the below 69 kV band. The median named US substation in this dataset is 115 kV, so MENDOCINO is below the national midpoint.

How many transmission lines connect to MENDOCINO substation?

8 transmission lines terminate at or pass through MENDOCINO in the HIFLD line data. The connected lines listed here run at 115 kV, 60 kV. Together the listed lines cover about 177.5 miles.

Who owns MENDOCINO substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at MENDOCINO belong to PACIFIC GAS & ELECTRIC COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is MENDOCINO substation located?

MENDOCINO is in California at 39.2506, -123.1964. The datacenter candidate sites closest to it are in Lake County, Mendocino County.

Are there datacenter candidate sites near MENDOCINO substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of MENDOCINO. The highest-scoring is LUCERNE at 47/100. Across California, the average DC Readiness score is 45.4.

Other 60 kV substations in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “MENDOCINO substation, California”, https://gridcensus.com/substations/california/mendocino-0ef8e6b6 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for MENDOCINO substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.