At a glance

SCHNITZER STEEL is a 60 kV electric substation in California on PACIFIC GAS & ELECTRIC COMPANY's transmission network, recorded in the HIFLD transmission dataset. 1 transmission line connect to it. 1,504 of California's 3,003 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is Hunters Point in San Mateo County, with a DC Readiness score of 61/100.

SCHNITZER STEEL is an electric transmission substation in California, on PACIFIC GAS & ELECTRIC COMPANY's transmission network. It is classified as distribution (<69 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage60 kV
Min voltage115 kV
Voltage classDistribution (<69 kV)
Connected lines1

Ownership

Line owner (most lines)PACIFIC GAS & ELECTRIC COMPANY
Coordinates37.7985, -122.2885

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#306357115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE0.4 mi
#308623115 kVPACIFIC GAS & ELECTRIC COMPANY—0.0 mi
#311253115 kV—IN SERVICE1.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SCHNITZER STEEL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SCHNITZER STEEL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Hunters PointBrownfieldCASan Mateo County115 kV427 MW7.6 yrs61.3
EMBARCADEROSubstation-AdjacentCAContra Costa County230 kV300 MW7.6 yrs59.8
NEWARK DISTRIBUTIONSubstation-AdjacentCAAlameda County230 kV300 MW7.6 yrs59.3
MARTINSubstation-AdjacentCASan Mateo County230 kV300 MW7.6 yrs59.0
S.L.A.C.Substation-AdjacentCASan Mateo County230 kV300 MW7.6 yrs58.8
EASTSHORESubstation-AdjacentCAAlameda County230 kV300 MW7.6 yrs58.7
LOS ESTEROSSubstation-AdjacentCAAlameda County230 kV300 MW7.6 yrs58.6
FREMONTSubstation-AdjacentCAAlameda County230 kV300 MW7.6 yrs58.4

How does SCHNITZER STEEL compare with other substations in California?

California has 4,260 substation records in HIFLD, of which 3,003 carry a station name; the rest are unnamed tap points, risers and line ends. 1,439 named substations in the state are in SCHNITZER STEEL's below 69 kV band (48% of named stations). 1,504 sit in a higher band. 44 named substations in California operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 69 kV.

Who owns the transmission lines at SCHNITZER STEEL?

The 3 connected lines listed above are owned by PACIFIC GAS & ELECTRIC COMPANY. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 2.3 miles.

How do candidate sites near SCHNITZER STEEL score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 61 on the 0–100 DC Readiness scale. They fall in San Mateo County, Contra Costa County, Alameda County. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is SCHNITZER STEEL substation?

SCHNITZER STEEL has a maximum voltage of 60 kV and a minimum of 115 kV. That places it in the below 69 kV band. The median named US substation in this dataset is 115 kV, so SCHNITZER STEEL is below the national midpoint.

How many transmission lines connect to SCHNITZER STEEL substation?

1 transmission line terminate at or pass through SCHNITZER STEEL in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 2.3 miles.

Who owns SCHNITZER STEEL substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at SCHNITZER STEEL belong to PACIFIC GAS & ELECTRIC COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is SCHNITZER STEEL substation located?

SCHNITZER STEEL is in California at 37.7985, -122.2885. The datacenter candidate sites closest to it are in San Mateo County, Contra Costa County, Alameda County.

Are there datacenter candidate sites near SCHNITZER STEEL substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of SCHNITZER STEEL. The highest-scoring is Hunters Point at 61/100. Across California, the average DC Readiness score is 45.4.

Other 60 kV substations in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “SCHNITZER STEEL substation, California”, https://gridcensus.com/substations/california/schnitzer-steel-e16b5393 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for SCHNITZER STEEL substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.