Skip to content
Gridcensus

DIVIDE

Substation

California · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
115
kV

At a glance

DIVIDE is a 115 kV electric substation in California on PACIFIC GAS & ELECTRIC COMPANY's transmission network, recorded in the HIFLD transmission dataset. 5 transmission lines connect to it. 428 of California's 3,003 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is DIABLO CANYON in San Luis Obispo County, with a DC Readiness score of 59/100.

DIVIDE is an electric transmission substation in California, on PACIFIC GAS & ELECTRIC COMPANY's transmission network. It is classified as sub-transmission (115 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage60 kV
Voltage classSub-transmission (115 kV)
Connected lines5

Ownership

Line owner (most lines)PACIFIC GAS & ELECTRIC COMPANY
Coordinates34.8283, -120.4484

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#303614115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE9.2 mi
#304586115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE14.8 mi
#313142115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE9.1 mi
#31284560 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE6.8 mi
#31295960 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE6.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of DIVIDE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near DIVIDE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DIABLO CANYONSubstation-AdjacentCASan Luis Obispo County500 kV1,000 MW7.6 yrs59.3
MESASubstation-AdjacentCASan Luis Obispo County230 kV300 MW7.6 yrs54.1
CALLENDERSubstation-AdjacentCASan Luis Obispo County115 kV100 MW7.6 yrs51.0
UNKNOWN306853Substation-AdjacentCASan Luis Obispo County115 kV100 MW7.6 yrs51.0
EC Near Santa Maria Cogen PlantGreenfieldCASanta Barbara——7.6 yrs50.9
EC Near Santa Maria Cogen PlantGreenfieldCASanta Barbara——7.6 yrs50.7
OCEANOSubstation-AdjacentCASan Luis Obispo County115 kV100 MW7.6 yrs50.4
SANTA MARIA COGENSubstation-AdjacentCASan Luis Obispo County115 kV100 MW7.6 yrs50.0

How does DIVIDE compare with other substations in California?

California has 4,260 substation records in HIFLD, of which 3,003 carry a station name; the rest are unnamed tap points, risers and line ends. 697 named substations in the state are in DIVIDE's 115–229 kV band (23% of named stations). 428 sit in a higher band. 44 named substations in California operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 69 kV.

Who owns the transmission lines at DIVIDE?

The 5 connected lines listed above are owned by PACIFIC GAS & ELECTRIC COMPANY. Line voltages range from 60 kV to 115 kV. Their combined recorded length is about 46.5 miles.

How do candidate sites near DIVIDE score?

The 8 highest-scoring candidate sites within about 25 miles range from 50 to 59 on the 0–100 DC Readiness scale. They fall in San Luis Obispo County, Santa Barbara. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is DIVIDE substation?

DIVIDE has a maximum voltage of 115 kV and a minimum of 60 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so DIVIDE is at the national midpoint.

How many transmission lines connect to DIVIDE substation?

5 transmission lines terminate at or pass through DIVIDE in the HIFLD line data. The connected lines listed here run at 115 kV, 60 kV. Together the listed lines cover about 46.5 miles.

Who owns DIVIDE substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at DIVIDE belong to PACIFIC GAS & ELECTRIC COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is DIVIDE substation located?

DIVIDE is in California at 34.8283, -120.4484. The datacenter candidate sites closest to it are in San Luis Obispo County, Santa Barbara.

Are there datacenter candidate sites near DIVIDE substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of DIVIDE. The highest-scoring is DIABLO CANYON at 59/100. Across California, the average DC Readiness score is 45.4.

Other 115 kV substations in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “DIVIDE substation, California”, https://gridcensus.com/substations/california/divide-e5b474ca (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for DIVIDE substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.