Skip to content
Gridcensus

CONTRA COSTA 3

Substation

California · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
60
kV

At a glance

CONTRA COSTA 3 is a 60 kV electric substation in California on PACIFIC GAS & ELECTRIC COMPANY's transmission network, recorded in the HIFLD transmission dataset. 2 transmission lines connect to it. 1,504 of California's 3,003 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is TESLA Power Project in Alameda County, with a DC Readiness score of 67/100.

CONTRA COSTA 3 is an electric transmission substation in California, on PACIFIC GAS & ELECTRIC COMPANY's transmission network. It is classified as distribution (<69 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage60 kV
Min voltage69 kV
Voltage classDistribution (<69 kV)
Connected lines2

Ownership

Line owner (most lines)PACIFIC GAS & ELECTRIC COMPANY
Coordinates37.9834, -121.7279

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#30632869 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE2.1 mi
#31106169 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE1.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CONTRA COSTA 3, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CONTRA COSTA 3 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TESLA Power ProjectBrownfieldCAAlameda County500 kV1,322 MW7.6 yrs66.5
TESLASubstation-AdjacentCAAlameda County500 kV1,000 MW7.6 yrs59.2
EASTSHORESubstation-AdjacentCAAlameda County230 kV300 MW7.6 yrs58.7
TRACYSubstation-AdjacentCASan Joaquin County500 kV1,000 MW7.6 yrs58.6
CASTRO VALLEYSubstation-AdjacentCAAlameda County230 kV300 MW7.6 yrs57.5
CASTRO VALLEY TAPSubstation-AdjacentCAAlameda County230 kV300 MW7.6 yrs57.4
VINEYARDSubstation-AdjacentCAAlameda County230 kV300 MW7.6 yrs56.7
SAN RAMONSubstation-AdjacentCAAlameda County230 kV300 MW7.6 yrs56.7

How does CONTRA COSTA 3 compare with other substations in California?

California has 4,260 substation records in HIFLD, of which 3,003 carry a station name; the rest are unnamed tap points, risers and line ends. 1,439 named substations in the state are in CONTRA COSTA 3's below 69 kV band (48% of named stations). 1,504 sit in a higher band. 44 named substations in California operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 69 kV.

Who owns the transmission lines at CONTRA COSTA 3?

The 2 connected lines listed above are owned by PACIFIC GAS & ELECTRIC COMPANY. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 3.3 miles.

How do candidate sites near CONTRA COSTA 3 score?

The 8 highest-scoring candidate sites within about 25 miles range from 57 to 67 on the 0–100 DC Readiness scale. They fall in Alameda County, San Joaquin County. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is CONTRA COSTA 3 substation?

CONTRA COSTA 3 has a maximum voltage of 60 kV and a minimum of 69 kV. That places it in the below 69 kV band. The median named US substation in this dataset is 115 kV, so CONTRA COSTA 3 is below the national midpoint.

How many transmission lines connect to CONTRA COSTA 3 substation?

2 transmission lines terminate at or pass through CONTRA COSTA 3 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 3.3 miles.

Who owns CONTRA COSTA 3 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at CONTRA COSTA 3 belong to PACIFIC GAS & ELECTRIC COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is CONTRA COSTA 3 substation located?

CONTRA COSTA 3 is in California at 37.9834, -121.7279. The datacenter candidate sites closest to it are in Alameda County, San Joaquin County.

Are there datacenter candidate sites near CONTRA COSTA 3 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of CONTRA COSTA 3. The highest-scoring is TESLA Power Project at 67/100. Across California, the average DC Readiness score is 45.4.

Other 60 kV substations in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “CONTRA COSTA 3 substation, California”, https://gridcensus.com/substations/california/contra-costa-3-af6c3207 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for CONTRA COSTA 3 substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.