EC Near Superior Generation Energy Center
GreenfieldDouglas County, Wisconsin · MISO
EC Near Superior Generation Energy Center is a greenfield datacenter candidate site in Douglas County, Wisconsin, interconnecting through MISO. It screens at 54.3/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Douglas County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| M L Hibbard | Brownfield | — | 50 MW | — | 71.4 |
| UNKNOWN130957 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 71.2 |
| LAKE SUPERIOR PAPER | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 69.9 |
| TAP136169 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 69.6 |
| UNKNOWN133329 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 66.2 |
| STINSON | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 65.7 |
| TAP135621 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 64.8 |
| UNKNOWN129288 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 64.4 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for EC Near Superior Generation Energy Center, Douglas County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.