Datacenter Sites in Douglas County, Wisconsin
Douglas County has 42 scored datacenter candidate sites averaging 58.7/100 DC Readiness, with a catalogued aggregate of 5,150 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.
42
Candidate sites
58.7/100
Avg DC Readiness
5,150 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
Site-selection context for Douglas County
Yessales_tax_exemption
Datacenter tax incentive
12.31¢/kWh
Commercial electricity
9.14¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$2,828
Land price / acre
600
Cooling degree days
7,200
Heating degree days
44°F
Mean annual temp
Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
By site type
Top datacenter sites in Douglas County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| M L Hibbard | Brownfield | — | 50 MW | — | 71.4 |
| UNKNOWN130957 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 71.2 |
| LAKE SUPERIOR PAPER | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 69.9 |
| TAP136169 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 69.6 |
| UNKNOWN133329 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 66.2 |
| STINSON | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 65.7 |
| TAP135621 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 64.8 |
| UNKNOWN129288 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 64.4 |
| UNKNOWN129293 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 64.1 |
| UNKNOWN129294 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 63.6 |
| Greenfield (STONE LAKE - ARROWHEAD) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 63.4 |
| Greenfield (STONE LAKE - ARROWHEAD) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 63.1 |
| Greenfield (STONE LAKE - ARROWHEAD) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 62.8 |
| UNKNOWN130956 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 62.7 |
| Greenfield (STINSON - TAP163053) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 62.2 |
| M.L. HIBBARD S.E. STATION | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 61.8 |
| EC Near Superior Generation Energy Center | Greenfield | — | — | 1.4 yrs | 61.5 |
| Greenfield (STINSON - TAP163053) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 61.4 |
| Greenfield (STONE LAKE - ARROWHEAD) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 61.1 |
| Greenfield (STINSON - TAP163053) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 60.8 |
| Greenfield (STONE LAKE - ARROWHEAD) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 59.9 |
| Greenfield (STINSON - TAP163053) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 59.4 |
| Greenfield (STINSON - TAP163053) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 59.0 |
| TAP135620 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 58.9 |
| TAP163053 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 58.5 |
Douglas County datacenter FAQ
- How many datacenter sites are in Douglas County?
- 42 scored datacenter candidate sites, averaging 58.7/100 DC Readiness.
- Does Douglas County offer datacenter tax incentives?
- Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
- What is the natural-hazard risk in Douglas County?
- FEMA's National Risk Index rates Douglas County as "Relatively Low" (score 22).
- What are industrial electricity rates in Douglas County?
- Average industrial electricity is 9.14¢/kWh and commercial is 12.31¢/kWh in Douglas County.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Douglas County, Wisconsin. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.