Skip to content
Gridcensus

Douglas County, Wisconsin · MISO

DC Readiness
59.0
Good / 100

TAP136169 is a substation-adjacent datacenter candidate site in Douglas County, Wisconsin, interconnecting through MISO. It screens at 59.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP136169
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW

Speed to power

ISO / RTO regionMISO
Queue depth27
Avg queue wait2.8 yrs

Connectivity

Nearest IXPDuluth Missabe
IXP distance7.5 mi
Fiber providers5
Fiber coverage10.9%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterDuluth Missabe
DC distance7.5 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.31¢/kWh
Industrial electricity9.14¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$2,828

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
40
Fiber connectivity12%
55
Energy cost10%
50
Water risk8%
94
Natural hazard8%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Douglas County, ranked by DC Readiness.

Sites near TAP136169
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN129284Substation-Adjacent115 kV100 MW2.8 yrs62.8
UNKNOWN130956Substation-Adjacent115 kV100 MW2.8 yrs62.8
STINSONSubstation-Adjacent161 kV100 MW2.8 yrs61.6
TAP135623Substation-Adjacent115 kV100 MW2.8 yrs61.6
UNKNOWN129288Substation-Adjacent115 kV100 MW2.8 yrs61.3
EC Near Superior Generation Energy CenterGreenfield1.4 yrs60.5
UNKNOWN129271Substation-Adjacent115 kV100 MW2.8 yrs60.2
EC Near Superior Generation Energy CenterGreenfield1.4 yrs60.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP136169, Douglas County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.