COLUMBIA BASIN PROJECT

Federal Excess

Douglas County, Washington · WECC

DC Readiness
38.8
Limited / 100

COLUMBIA BASIN PROJECT is a federal excess datacenter candidate site in Douglas County, Washington, interconnecting through WECC. It screens at 38.8/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionWECC
Queue depth74

Connectivity

Nearest IXPServerfarm TiTAN Moses Lake
IXP distance52.3 mi

Site characteristics

Acreage61 ac
Former useReclamation and Irrigation

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterServerfarm TiTAN Moses Lake
DC distance52.3 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity4.83¢/kWh
Industrial electricity3.97¢/kWh
Cooling degree days300
Heating degree days5,000
Land price / acre$2,784

Incentive detail: Sales tax exemption on DC equipment and construction for eligible facilities; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
25
Fiber connectivity12%
40
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Douglas County, ranked by DC Readiness.

Sites near COLUMBIA BASIN PROJECT
SiteTypeVoltageCapacityQueue waitScore
GRAND COULEE 500KVSubstation-Adjacent500 kV1,000 MW1.7 yrs69.6
GRAND COULEE 230KVSubstation-Adjacent500 kV1,000 MW1.7 yrs69.4
GRAND COULEESubstation-Adjacent500 kV1,000 MW1.7 yrs68.8
Greenfield (SCHULTZ - SICKLER)Greenfield500 kV1,000 MW1.7 yrs68.6
CHIEF JOSEPHSubstation-Adjacent500 kV1,000 MW1.7 yrs67.7
Greenfield (CHIEF JOSEPH - SICKLER)Greenfield500 kV1,000 MW1.7 yrs66.4
FOSTER CREEKSubstation-Adjacent230 kV300 MW1.7 yrs66.0
WELLSSubstation-Adjacent230 kV300 MW1.7 yrs65.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for COLUMBIA BASIN PROJECT, Douglas County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.