Datacenter Sites in Polk County, Texas
Polk County has 18 scored datacenter candidate sites averaging 54.1/100 DC Readiness, with a catalogued aggregate of 2,050 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.
At a glance
Polk County, Texas has 18 scored datacenter candidate sites averaging 54.1/100 DC Readiness, roughly in line with the Texas average of 56.4. It ranks 102nd of 234 Texas counties by number of sites and 155th by average score. The top-scoring site is Substation-Adjacent site · 118c6022 at 63.3/100.
Site-selection context for Polk County
Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.
How does Polk County compare with other counties in Texas?
By number of scored sites, Polk County ranks 102nd of the 234 Texas counties with a county page, holding 0.3% of the state's 6,839 sites. Its average DC Readiness of 54.1/100 ranks 155th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1835th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 7 score 55 or higher.
What types of datacenter sites are in Polk County?
Substation-Adjacent sites are the most common (12, 67% of the county's inventory), followed by greenfield (4) and industrial (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Polk County?
Industrial electricity averages 7.64¢/kWh and commercial 11.44¢/kWh. FEMA's National Risk Index rates the county "Very High" (55). WRI water stress is medium-high. 6 fiber providers report service in the county. The climate runs 2,600 cooling degree days a year with a mean temperature of 65°F. Land is valued around $4,083 an acre.
By site type
Top datacenter sites in Polk County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN306366 | Substation-Adjacent | 500 kV | 1,000 MW | 3.5 yrs | 63.3 |
| OZ Polk | Greenfield | — | — | 3.5 yrs | 58.2 |
| UNKNOWN300371 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 56.6 |
| UNKNOWN308643 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 56.5 |
| UNKNOWN301461 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 55.8 |
| UNKNOWN304565 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 55.0 |
| UNKNOWN310365 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 55.0 |
| UNKNOWN300500 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 54.9 |
| UNKNOWN303741 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 54.4 |
| UNKNOWN307827 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 54.3 |
| UNKNOWN306449 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 54.3 |
| UNKNOWN307295 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 54.1 |
| OZ Polk | Greenfield | — | — | 3.5 yrs | 53.8 |
| UNKNOWN305956 | Substation-Adjacent | 69 kV | 50 MW | 3.5 yrs | 52.4 |
| OZ Polk | Greenfield | — | — | 3.5 yrs | 52.1 |
| EC FFE Polk County | Greenfield | — | — | 3.5 yrs | 48.8 |
| Alabama-Coushatta Tribe - Midway West Road Landfil | Industrial | — | — | 3.5 yrs | 47.6 |
| Midway West Road Landfill (Alabama Coushatta Tribe | Industrial | — | — | 3.5 yrs | 47.5 |
Every scored site in Polk County
All 18 sites, best first.
- Substation-Adjacent site · 118c6022 · 63.3
- OZ Polk · b89c1dad · 58.2
- Substation-Adjacent site · 924d5d92 · 56.6
- Substation-Adjacent site · e301bd92 · 56.5
- Substation-Adjacent site · fd0ea25a · 55.8
- Substation-Adjacent site · 452a490d · 55.0
- Substation-Adjacent site · 2a6161b0 · 55.0
- Substation-Adjacent site · 4eaf242e · 54.9
- Substation-Adjacent site · 0449d310 · 54.4
- Substation-Adjacent site · 9e70548e · 54.3
- Substation-Adjacent site · d00cca75 · 54.3
- Substation-Adjacent site · 7d05b206 · 54.1
- OZ Polk · 798c13f9 · 53.8
- Substation-Adjacent site · 0453482e · 52.4
- OZ Polk · 473ab01a · 52.1
- EC FFE Polk County · 48.8
- Alabama-Coushatta Tribe - Midway West Road Landfil · 47.6
- Midway West Road Landfill (Alabama Coushatta Tribe · 47.5
Polk County datacenter FAQ
How many datacenter sites are in Polk County?
18 scored datacenter candidate sites, averaging 54.1/100 DC Readiness. That is the 102nd-most of 234 Texas counties with five or more sites.
What is the highest-scoring datacenter site in Polk County?
Substation-Adjacent site · 118c6022 scores 63.3/100 DC Readiness, the highest of the 18 scored sites in Polk County (a substation-adjacent site).
Does Polk County offer datacenter tax incentives?
Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.
What is the natural-hazard risk in Polk County?
FEMA's National Risk Index rates Polk County as "Very High" (score 55).
What are industrial electricity rates in Polk County?
Average industrial electricity is 7.64¢/kWh and commercial is 11.44¢/kWh in Polk County.
More in Texas
- All datacenter sites in Texas· 6,839 sites
- Operating datacenters in Texas
- Electric substations in Texas
- Harris County· 348 sites · avg 57.3
- Dallas County· 308 sites · avg 61.3
- Tarrant County· 289 sites · avg 59.4
- Travis County· 203 sites · avg 59.8
- El Paso County· 172 sites · avg 54.5
- Bexar County· 166 sites · avg 61.7
- Substation-Adjacent sites in Texas
- Greenfield sites in Texas
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Polk County, Texas”, https://gridcensus.com/datacenter-sites/texas/polk-county (data as of November 13, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Polk County, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.