Datacenter Sites in Ector County, Texas

Ector County has 28 scored datacenter candidate sites averaging 55.7/100 DC Readiness, with a catalogued aggregate of 6,200 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.

At a glance

Ector County, Texas has 28 scored datacenter candidate sites averaging 55.7/100 DC Readiness, roughly in line with the Texas average of 56.4. It ranks 64th of 234 Texas counties by number of sites and 103rd by average score. The top-scoring site is MOSS SWITCHYARD at 61.6/100.

28
Candidate sites
55.7/100
Avg DC Readiness
6,200 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Ector County

Site-selection context for Ector County

Yessales_tax_exemption
Datacenter tax incentive
17.02¢/kWh
Commercial electricity
6.84¢/kWh
Industrial electricity
6
Fiber providers
Medium-High
Water stress
$1,824
Land price / acre
2,600
Cooling degree days
1,800
Heating degree days
65°F
Mean annual temp

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

How does Ector County compare with other counties in Texas?

By number of scored sites, Ector County ranks 64th of the 234 Texas counties with a county page, holding 0.4% of the state's 6,839 sites. Its average DC Readiness of 55.7/100 ranks 103rd in the state and is roughly in line with the national average of 53.0. Nationally it has the 1344th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 16 score 55 or higher.

What types of datacenter sites are in Ector County?

Substation-Adjacent sites are the most common (25, 89% of the county's inventory), followed by former mine (1) and greenfield (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Ector County?

Industrial electricity averages 6.84¢/kWh and commercial 17.02¢/kWh. FEMA's National Risk Index rates the county "Very High" (55). WRI water stress is medium-high. 6 fiber providers report service in the county. The climate runs 2,600 cooling degree days a year with a mean temperature of 65°F. Land is valued around $1,824 an acre.

By site type

Top datacenter sites in Ector County

Top datacenter sites in Ector County
SiteTypeVoltageCapacityQueue waitScore
MOSS SWITCHYARDSubstation-Adjacent345 kV600 MW3.5 yrs61.6
UNKNOWN310183Substation-Adjacent345 kV600 MW3.5 yrs60.9
UNKNOWN306186Substation-Adjacent345 kV600 MW3.5 yrs60.9
ODESSASubstation-Adjacent345 kV600 MW3.5 yrs60.9
UNKNOWN300550Substation-Adjacent345 kV600 MW3.5 yrs60.4
UNKNOWN305503Substation-Adjacent345 kV600 MW3.5 yrs59.7
UNKNOWN304328Substation-Adjacent230 kV300 MW3.5 yrs58.4
UNKNOWN304950Substation-Adjacent138 kV100 MW3.5 yrs55.9
UNKNOWN303142Substation-Adjacent138 kV100 MW3.5 yrs55.8
TAP310839Substation-Adjacent138 kV100 MW3.5 yrs55.8
TAP310568Substation-Adjacent138 kV100 MW3.5 yrs55.7
UNKNOWN309593Substation-Adjacent138 kV100 MW3.5 yrs55.7
UNKNOWN306239Substation-Adjacent138 kV100 MW3.5 yrs55.1
TAP307917Substation-Adjacent138 kV100 MW3.5 yrs55.1
UNKNOWN307730Substation-Adjacent138 kV100 MW3.5 yrs55.0
UNKNOWN306826Substation-Adjacent138 kV100 MW3.5 yrs55.0
ODESSA SOUTHWESTSubstation-Adjacent138 kV100 MW3.5 yrs54.9
UNKNOWN306035Substation-Adjacent138 kV100 MW3.5 yrs54.9
TAP302627Substation-Adjacent138 kV100 MW3.5 yrs54.9
UNKNOWN307194Substation-Adjacent138 kV100 MW3.5 yrs54.8
UNKNOWN304706Substation-Adjacent138 kV100 MW3.5 yrs54.5
Greenfield (ODESSA 345 - None)Greenfield345 kV600 MW3.5 yrs54.5
TAP302715Substation-Adjacent138 kV100 MW3.5 yrs53.8
UNKNOWN309588Substation-Adjacent138 kV100 MW3.5 yrs53.4
UNKNOWN304921Substation-Adjacent69 kV50 MW3.5 yrs52.9

Every scored site in Ector County

All 28 sites, best first.

Ector County datacenter FAQ

How many datacenter sites are in Ector County?

28 scored datacenter candidate sites, averaging 55.7/100 DC Readiness. That is the 64th-most of 234 Texas counties with five or more sites.

What is the highest-scoring datacenter site in Ector County?

MOSS SWITCHYARD scores 61.6/100 DC Readiness, the highest of the 28 scored sites in Ector County (a substation-adjacent site).

Does Ector County offer datacenter tax incentives?

Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

What is the natural-hazard risk in Ector County?

FEMA's National Risk Index rates Ector County as "Very High" (score 55).

What are industrial electricity rates in Ector County?

Average industrial electricity is 6.84¢/kWh and commercial is 17.02¢/kWh in Ector County.

More in Texas

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Ector County, Texas”, https://gridcensus.com/datacenter-sites/texas/ector-county (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Ector County, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.