Datacenter Sites in Eastland County, Texas
Eastland County has 17 scored datacenter candidate sites averaging 53.4/100 DC Readiness, with a catalogued aggregate of 700 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.
At a glance
Eastland County, Texas has 17 scored datacenter candidate sites averaging 53.4/100 DC Readiness, roughly in line with the Texas average of 56.4. It ranks 107th of 234 Texas counties by number of sites and 171st by average score. The top-scoring site is EC FFE Eastland County at 57.9/100.
Site-selection context for Eastland County
Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.
How does Eastland County compare with other counties in Texas?
By number of scored sites, Eastland County ranks 107th of the 234 Texas counties with a county page, holding 0.2% of the state's 6,839 sites. Its average DC Readiness of 53.4/100 ranks 171st in the state and is roughly in line with the national average of 53.0. Nationally it has the 1896th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 6 score 55 or higher.
What types of datacenter sites are in Eastland County?
Substation-Adjacent sites are the most common (10, 59% of the county's inventory), followed by industrial (4) and greenfield (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Eastland County?
Industrial electricity averages 10.32¢/kWh and commercial 7.82¢/kWh. FEMA's National Risk Index rates the county "Very High" (55). WRI water stress is medium-high. 2 fiber providers report service in the county. The climate runs 2,600 cooling degree days a year with a mean temperature of 65°F. Land is valued around $3,026 an acre.
By site type
Top datacenter sites in Eastland County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC FFE Eastland County | Greenfield | — | — | 3.5 yrs | 57.9 |
| OZ Eastland | Greenfield | — | — | 3.5 yrs | 56.1 |
| UNKNOWN304665 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 56.0 |
| UNKNOWN304522 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 56.0 |
| TAP310834 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 56.0 |
| UNKNOWN308355 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 55.9 |
| UNKNOWN300466 | Substation-Adjacent | 69 kV | 50 MW | 3.5 yrs | 53.9 |
| UNKNOWN308468 | Substation-Adjacent | 69 kV | 50 MW | 3.5 yrs | 53.8 |
| UNKNOWN303211 | Substation-Adjacent | 69 kV | 50 MW | 3.5 yrs | 53.8 |
| UNKNOWN309220 | Substation-Adjacent | 69 kV | 50 MW | 3.5 yrs | 53.7 |
| UNKNOWN304124 | Substation-Adjacent | 69 kV | 50 MW | 3.5 yrs | 53.2 |
| UNKNOWN301674 | Substation-Adjacent | 69 kV | 50 MW | 3.5 yrs | 52.6 |
| Mine Site | Former Mine | — | — | 3.5 yrs | 49.9 |
| Westfall Property | Industrial | — | — | 3.5 yrs | 49.9 |
| Frank Gray Park/Bass Lake | Industrial | — | — | 3.5 yrs | 49.8 |
| Bailey Property | Industrial | — | — | 3.5 yrs | 49.8 |
| Old Taylor Convenience Store | Industrial | — | — | 3.5 yrs | 48.8 |
Every scored site in Eastland County
All 17 sites, best first.
- EC FFE Eastland County · 57.9
- OZ Eastland · 56.1
- Substation-Adjacent site · c5b73da9 · 56.0
- Substation-Adjacent site · cdad2e43 · 56.0
- Substation-Adjacent site · cb7a50d5 · 56.0
- Substation-Adjacent site · 0a50153b · 55.9
- Substation-Adjacent site · d93c1992 · 53.9
- Substation-Adjacent site · 47e86f6f · 53.8
- Substation-Adjacent site · 29df20c2 · 53.8
- Substation-Adjacent site · 5c95c257 · 53.7
- Substation-Adjacent site · 99aa03ac · 53.2
- Substation-Adjacent site · 86c0e09f · 52.6
- Mine Site · 4eea6ba7 · 49.9
- Westfall Property · 49.9
- Frank Gray Park/Bass Lake · 49.8
- Bailey Property · 49.8
- Old Taylor Convenience Store · 48.8
Eastland County datacenter FAQ
How many datacenter sites are in Eastland County?
17 scored datacenter candidate sites, averaging 53.4/100 DC Readiness. That is the 107th-most of 234 Texas counties with five or more sites.
What is the highest-scoring datacenter site in Eastland County?
EC FFE Eastland County scores 57.9/100 DC Readiness, the highest of the 17 scored sites in Eastland County (a greenfield site).
Does Eastland County offer datacenter tax incentives?
Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.
What is the natural-hazard risk in Eastland County?
FEMA's National Risk Index rates Eastland County as "Very High" (score 55).
What are industrial electricity rates in Eastland County?
Average industrial electricity is 10.32¢/kWh and commercial is 7.82¢/kWh in Eastland County.
More in Texas
- All datacenter sites in Texas· 6,839 sites
- Operating datacenters in Texas
- Electric substations in Texas
- Harris County· 348 sites · avg 57.3
- Dallas County· 308 sites · avg 61.3
- Tarrant County· 289 sites · avg 59.4
- Travis County· 203 sites · avg 59.8
- El Paso County· 172 sites · avg 54.5
- Bexar County· 166 sites · avg 61.7
- Substation-Adjacent sites in Texas
- Industrial sites in Texas
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Eastland County, Texas”, https://gridcensus.com/datacenter-sites/texas/eastland-county (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Eastland County, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.