Pennington County has 58 scored datacenter candidate sites averaging 59.7/100 DC Readiness, with a catalogued aggregate of 2,700 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.
At a glance
Pennington County, South Dakota has 58 scored datacenter candidate sites averaging 59.7/100 DC Readiness, roughly in line with the South Dakota average of 54.7. It ranks 3rd of 52 South Dakota counties by number of sites and 1st by average score. The top-scoring site is EC Coal Pennington County · e9465e3d at 66.9/100.
Site-selection context for Pennington County
Incentive detail: No state corporate income tax; no personal income tax; no personal property tax.
How does Pennington County compare with other counties in South Dakota?
By number of scored sites, Pennington County ranks 3rd of the 52 South Dakota counties with a county page, holding 5.0% of the state's 1,151 sites. Its average DC Readiness of 59.7/100 ranks 1st in the state and is about 13% above the national average of 53.0. Nationally it has the 642nd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 46 score 55 or higher.
What types of datacenter sites are in Pennington County?
Substation-Adjacent sites are the most common (25, 43% of the county's inventory), followed by greenfield (19) and former mine (10). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Pennington County?
Industrial electricity averages 13.16¢/kWh and commercial 13.55¢/kWh. FEMA's National Risk Index rates the county "Relatively Low" (22). WRI water stress is low-medium. 7 fiber providers report service in the county. The climate runs 700 cooling degree days a year with a mean temperature of 45°F. Land is valued around $1,513 an acre.
By site type
Top datacenter sites in Pennington County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Coal Pennington County | Greenfield | — | — | 4.3 yrs | 66.9 |
| SOUTH RAPID CITY | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 66.8 |
| RAPID CITY DC TIE | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 65.9 |
| LANGE | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 65.8 |
| EC Near Ben French | Greenfield | — | — | 4.3 yrs | 65.7 |
| EC Near Ben French | Greenfield | — | — | 4.3 yrs | 65.2 |
| EC Coal Pennington County | Greenfield | — | — | 4.3 yrs | 64.6 |
| EC Coal Pennington County | Greenfield | — | — | 4.3 yrs | 64.4 |
| EC Near Ben French | Greenfield | — | — | 4.3 yrs | 64.4 |
| EC Near Ben French | Greenfield | — | — | 4.3 yrs | 64.3 |
| EC Near Ben French | Greenfield | — | — | 4.3 yrs | 63.9 |
| NEW UNDERWOOD | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 63.5 |
| EC Coal Pennington County | Greenfield | — | — | 4.3 yrs | 63.3 |
| EC Coal Pennington County | Greenfield | — | — | 4.3 yrs | 63.2 |
| EC Coal Pennington County | Greenfield | — | — | 4.3 yrs | 63.0 |
| EC Coal Pennington County | Greenfield | — | — | 4.3 yrs | 61.8 |
| UNKNOWN131179 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 61.6 |
| EC Near Ben French | Greenfield | — | — | 4.3 yrs | 61.5 |
| EC Near Ben French | Greenfield | — | — | 4.3 yrs | 61.3 |
| EC Near Ben French | Greenfield | — | — | 4.3 yrs | 61.3 |
| UNKNOWN131182 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 61.1 |
| EC Near Ben French | Greenfield | — | — | 4.3 yrs | 61.1 |
| UNKNOWN131183 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 61.0 |
| TAP144189 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 60.6 |
| UNKNOWN131169 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 60.6 |
Every scored site in Pennington County
All 58 sites, best first.
- EC Coal Pennington County · e9465e3d · 66.9
- SOUTH RAPID CITY · 66.8
- RAPID CITY DC TIE · 65.9
- LANGE · 65.8
- EC Near Ben French · 09597aa9 · 65.7
- EC Near Ben French · bc42bd9a · 65.2
- EC Coal Pennington County · eeb88f92 · 64.6
- EC Near Ben French · 0a1057ee · 64.4
- EC Coal Pennington County · 4d02fa0a · 64.4
- EC Near Ben French · 3501179c · 64.3
- EC Near Ben French · e7d1ff9c · 63.9
- NEW UNDERWOOD · 63.5
- EC Coal Pennington County · da9d2138 · 63.3
- EC Coal Pennington County · fab4f290 · 63.2
- EC Coal Pennington County · c305b9a6 · 63.0
- EC Coal Pennington County · 40485839 · 61.8
- Substation-Adjacent site · a5accc54 · 61.6
- EC Near Ben French · f21fb65a · 61.5
- EC Near Ben French · 253b1789 · 61.3
- EC Near Ben French · 35ff79aa · 61.3
- EC Near Ben French · 6e700b26 · 61.1
- Substation-Adjacent site · 5c0d3086 · 61.1
- Substation-Adjacent site · 19289b57 · 61.0
- Substation-Adjacent site · 2a2865c6 · 60.6
- Substation-Adjacent site · 65840445 · 60.6
- Substation-Adjacent site · ddcd3bbd · 60.6
- Substation-Adjacent site · c3b6df10 · 60.6
- Substation-Adjacent site · 168b49ed · 60.6
- Substation-Adjacent site · de8cb8e2 · 60.5
- Substation-Adjacent site · 02797aaa · 60.5
- Substation-Adjacent site · c2887be0 · 60.5
- Substation-Adjacent site · e7599218 · 60.5
- Substation-Adjacent site · 46b4703f · 60.4
- Substation-Adjacent site · f89cc98e · 60.3
- Substation-Adjacent site · 03e0fa2c · 60.3
- EC Near Ben French · a3d08856 · 60.3
- Substation-Adjacent site · 9aeea3b7 · 60.2
- Substation-Adjacent site · 6fbe4816 · 59.6
- Substation-Adjacent site · 55ecbc18 · 59.4
- Substation-Adjacent site · abdc2216 · 59.3
- Substation-Adjacent site · 97feaa51 · 57.1
- Substation-Adjacent site · f33fe1f9 · 57.0
- SDSM&T Property · 56.6
- Ulland Outlot · 56.6
- EC Coal Pennington County · 44edb16f · 56.5
- Mine Site · 4b05972e · 55.5
- Mine Site · 764d3b6d · 54.6
- Mine Site · 7591b5aa · 54.5
- Mine Site · 1cc7f111 · 54.4
- Mine Site · 92423245 · 54.4
- Mine Site · 527374c7 · 54.4
- Hill City Lagoons · 53.3
- Mine Site · 947c69c3 · 53.2
- Mine Site · 4fdec1dd · 52.6
- Greenfield (UNKNOWN131185 - NEW UNDERWOOD) · 52.2
- Mine Site · 637a3927 · 51.5
- Glenn Street Property · 51.5
- Mine Site · 89ac4667 · 50.9
Pennington County datacenter FAQ
How many datacenter sites are in Pennington County?
58 scored datacenter candidate sites, averaging 59.7/100 DC Readiness. That is the 3rd-most of 52 South Dakota counties with five or more sites.
What is the highest-scoring datacenter site in Pennington County?
EC Coal Pennington County · e9465e3d scores 66.9/100 DC Readiness, the highest of the 58 scored sites in Pennington County (a greenfield site).
Does Pennington County offer datacenter tax incentives?
No state corporate income tax; no personal income tax; no personal property tax.
What is the natural-hazard risk in Pennington County?
FEMA's National Risk Index rates Pennington County as "Relatively Low" (score 22).
What are industrial electricity rates in Pennington County?
Average industrial electricity is 13.16¢/kWh and commercial is 13.55¢/kWh in Pennington County.
More in South Dakota
- All datacenter sites in South Dakota· 1,151 sites
- Operating datacenters in South Dakota
- Electric substations in South Dakota
- Minnehaha County· 95 sites · avg 58.1
- Day County· 82 sites · avg 51.9
- Beadle County· 51 sites · avg 55.1
- Charles Mix County· 40 sites · avg 53.4
- Brown County· 37 sites · avg 57.4
- Brookings County· 35 sites · avg 55.3
- Substation-Adjacent sites in South Dakota
- Greenfield sites in South Dakota
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Pennington County, South Dakota”, https://gridcensus.com/datacenter-sites/south-dakota/pennington-county (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Pennington County, South Dakota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.