Datacenter Sites in Pike County, Ohio
Pike County has 18 scored datacenter candidate sites averaging 52.6/100 DC Readiness, with a catalogued aggregate of 3,400 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
At a glance
Pike County, Ohio has 18 scored datacenter candidate sites averaging 52.6/100 DC Readiness, roughly in line with the Ohio average of 53.2. It ranks 57th of 85 Ohio counties by number of sites and 45th by average score. The top-scoring site is DON MARQUIS 765 KV at 63.6/100.
Site-selection context for Pike County
Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.
How does Pike County compare with other counties in Ohio?
By number of scored sites, Pike County ranks 57th of the 85 Ohio counties with a county page, holding 0.5% of the state's 3,933 sites. Its average DC Readiness of 52.6/100 ranks 45th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1835th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 6 score 55 or higher.
What types of datacenter sites are in Pike County?
Substation-Adjacent sites are the most common (6, 33% of the county's inventory), followed by former mine (6) and greenfield (5). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Pike County?
Industrial electricity averages 10.71¢/kWh and commercial 13.59¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 6 fiber providers report service in the county. The climate runs 900 cooling degree days a year with a mean temperature of 51°F. Land is valued around $3,899 an acre.
By site type
Top datacenter sites in Pike County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| DON MARQUIS 765 KV | Substation-Adjacent | 765 kV | 1,000 MW | 5.2 yrs | 63.6 |
| TAP137802 | Substation-Adjacent | 345 kV | 600 MW | 5.2 yrs | 61.1 |
| UNKNOWN137829 | Substation-Adjacent | 138 kV | 100 MW | 5.2 yrs | 55.2 |
| WAVERLY SUBSTATION | Substation-Adjacent | 138 kV | 100 MW | 5.2 yrs | 55.1 |
| UNKNOWN113934 | Substation-Adjacent | 138 kV | 100 MW | 5.2 yrs | 55.1 |
| EC FFE Pike County | Greenfield | — | — | 5.2 yrs | 55.0 |
| UNKNOWN137857 | Substation-Adjacent | 138 kV | 100 MW | 5.2 yrs | 54.6 |
| Greenfield (TAP137356 - DON MARQUIS) | Greenfield | 345 kV | 600 MW | 5.2 yrs | 54.6 |
| Greenfield (TAP137356 - DON MARQUIS) | Greenfield | 345 kV | 600 MW | 5.2 yrs | 54.5 |
| Mine Site | Former Mine | — | — | 5.2 yrs | 48.9 |
| Mine Site | Former Mine | — | — | 5.2 yrs | 48.8 |
| Mine Site | Former Mine | — | — | 5.2 yrs | 48.7 |
| Greenfield (WAVERLY SUBSTATION - DON MARQU) | Greenfield | 138 kV | 100 MW | 5.2 yrs | 48.6 |
| Portsmouth Gaseous | Federal Excess | — | — | 5.2 yrs | 48.6 |
| Mine Site | Former Mine | — | — | 5.2 yrs | 48.6 |
| Mine Site | Former Mine | — | — | 5.2 yrs | 48.6 |
| Greenfield (MILLBROOK PARK SUBSTATION - TA) | Greenfield | 138 kV | 100 MW | 5.2 yrs | 48.5 |
| Mine Site | Former Mine | — | — | 5.2 yrs | 48.2 |
Every scored site in Pike County
All 18 sites, best first.
- DON MARQUIS 765 KV · 63.6
- Substation-Adjacent site · 2729b6d0 · 61.1
- Substation-Adjacent site · 335cf15d · 55.2
- WAVERLY SUBSTATION · 55.1
- Substation-Adjacent site · 6066bf98 · 55.1
- EC FFE Pike County · 55.0
- Substation-Adjacent site · 608b930c · 54.6
- Greenfield (TAP137356 - DON MARQUIS) · aed62fea · 54.6
- Greenfield (TAP137356 - DON MARQUIS) · b9867e78 · 54.5
- Mine Site · acf3ff07 · 48.9
- Mine Site · 60601742 · 48.8
- Mine Site · 50411553 · 48.7
- Greenfield (WAVERLY SUBSTATION - DON MARQU) · 48.6
- Portsmouth Gaseous · 031f0e11 · 48.6
- Mine Site · 5262a351 · 48.6
- Mine Site · 3c2a7627 · 48.6
- Greenfield (MILLBROOK PARK SUBSTATION - TA) · 48.5
- Mine Site · 3187540c · 48.2
Pike County datacenter FAQ
How many datacenter sites are in Pike County?
18 scored datacenter candidate sites, averaging 52.6/100 DC Readiness. That is the 57th-most of 85 Ohio counties with five or more sites.
What is the highest-scoring datacenter site in Pike County?
DON MARQUIS 765 KV scores 63.6/100 DC Readiness, the highest of the 18 scored sites in Pike County (a substation-adjacent site).
Does Pike County offer datacenter tax incentives?
DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.
What is the natural-hazard risk in Pike County?
FEMA's National Risk Index rates Pike County as "Relatively Moderate" (score 30).
What are industrial electricity rates in Pike County?
Average industrial electricity is 10.71¢/kWh and commercial is 13.59¢/kWh in Pike County.
More in Ohio
- All datacenter sites in Ohio· 3,933 sites
- Operating datacenters in Ohio
- Electric substations in Ohio
- Cuyahoga County· 348 sites · avg 55.2
- Lucas County· 221 sites · avg 53.8
- Hamilton County· 177 sites · avg 56.7
- Lorain· 139 sites · avg 53.5
- Summit County· 129 sites · avg 55.5
- Jefferson County· 125 sites · avg 49.2
- Substation-Adjacent sites in Ohio
- Former Mine sites in Ohio
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Pike County, Ohio”, https://gridcensus.com/datacenter-sites/ohio/pike-county (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Pike County, Ohio is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.