Datacenter Sites in Miami County, Ohio

Miami County has 41 scored datacenter candidate sites averaging 53.4/100 DC Readiness, with a catalogued aggregate of 2,000 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Miami County, Ohio has 41 scored datacenter candidate sites averaging 53.4/100 DC Readiness, roughly in line with the Ohio average of 53.2. It ranks 28th of 85 Ohio counties by number of sites and 33rd by average score. The top-scoring site is MIAMI at 63.3/100.

41
Candidate sites
53.4/100
Avg DC Readiness
2,000 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Miami County

Site-selection context for Miami County

Yessales_tax_exemption
Datacenter tax incentive
10.30¢/kWh
Commercial electricity
7.80¢/kWh
Industrial electricity
10
Fiber providers
Low
Water stress
$10,549
Land price / acre
900
Cooling degree days
5,400
Heating degree days
51°F
Mean annual temp

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

How does Miami County compare with other counties in Ohio?

By number of scored sites, Miami County ranks 28th of the 85 Ohio counties with a county page, holding 1.0% of the state's 3,933 sites. Its average DC Readiness of 53.4/100 ranks 33rd in the state and is roughly in line with the national average of 53.0. Nationally it has the 949th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 18 score 55 or higher.

What types of datacenter sites are in Miami County?

Industrial sites are the most common (17, 41% of the county's inventory), followed by substation-adjacent (12) and greenfield (11). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Miami County?

Industrial electricity averages 7.80¢/kWh and commercial 10.30¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 10 fiber providers report service in the county. The climate runs 900 cooling degree days a year with a mean temperature of 51°F. Land is valued around $10,549 an acre.

By site type

Top datacenter sites in Miami County

Top datacenter sites in Miami County
SiteTypeVoltageCapacityQueue waitScore
MIAMISubstation-Adjacent345 kV600 MW5.2 yrs63.3
WEST MILTONSubstation-Adjacent345 kV600 MW5.2 yrs62.7
EC Near Piqua Power PlantGreenfield——5.2 yrs58.1
EC Near Piqua Power PlantGreenfield——5.2 yrs57.4
NEW CARLISLESubstation-Adjacent138 kV100 MW5.2 yrs57.1
STAUNTONSubstation-Adjacent138 kV100 MW5.2 yrs56.8
ELDEANSubstation-Adjacent138 kV100 MW5.2 yrs56.7
TAP141226Substation-Adjacent138 kV100 MW5.2 yrs56.7
EC Near Piqua Power PlantGreenfield——5.2 yrs56.4
EC Near Piqua Power PlantGreenfield——5.2 yrs56.4
TAP141227Substation-Adjacent138 kV100 MW5.2 yrs56.4
EC Near Piqua Power PlantGreenfield——5.2 yrs56.3
EC Near Piqua Power PlantGreenfield——5.2 yrs56.1
EC Near Piqua Power PlantGreenfield——5.2 yrs55.5
UNKNOWN141228Substation-Adjacent138 kV100 MW5.2 yrs55.4
UNKNOWN112951Substation-Adjacent69 kV50 MW5.2 yrs55.3
UNKNOWN113861Substation-Adjacent69 kV50 MW5.2 yrs55.3
EC Near Piqua Power PlantGreenfield——5.2 yrs55.2
PIQUA POWER PLANTSubstation-Adjacent69 kV50 MW5.2 yrs54.8
EC Near Piqua Power PlantGreenfield——5.2 yrs54.7
EC Near Piqua Power PlantGreenfield——5.2 yrs53.8
EC Near Piqua Power PlantGreenfield——5.2 yrs53.1
UNKNOWN113852Substation-Adjacent69 kV50 MW5.2 yrs53.0
West Milton Pure Gas StationIndustrial——5.2 yrs50.3
Mine SiteFormer Mine——5.2 yrs50.1

Every scored site in Miami County

All 41 sites, best first.

Miami County datacenter FAQ

How many datacenter sites are in Miami County?

41 scored datacenter candidate sites, averaging 53.4/100 DC Readiness. That is the 28th-most of 85 Ohio counties with five or more sites.

What is the highest-scoring datacenter site in Miami County?

MIAMI scores 63.3/100 DC Readiness, the highest of the 41 scored sites in Miami County (a substation-adjacent site).

Does Miami County offer datacenter tax incentives?

DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

What is the natural-hazard risk in Miami County?

FEMA's National Risk Index rates Miami County as "Relatively Moderate" (score 30).

What are industrial electricity rates in Miami County?

Average industrial electricity is 7.80¢/kWh and commercial is 10.30¢/kWh in Miami County.

More in Ohio

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Miami County, Ohio”, https://gridcensus.com/datacenter-sites/ohio/miami-county (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Miami County, Ohio is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.