Datacenter Sites in Greene County, Ohio

Greene County has 36 scored datacenter candidate sites averaging 56.2/100 DC Readiness, with a catalogued aggregate of 3,150 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Greene County, Ohio has 36 scored datacenter candidate sites averaging 56.2/100 DC Readiness, roughly in line with the Ohio average of 53.2. It ranks 35th of 85 Ohio counties by number of sites and 13th by average score. The top-scoring site is SUGAR CREEK at 65.2/100.

36
Candidate sites
56.2/100
Avg DC Readiness
3,150 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Greene County

Site-selection context for Greene County

Yessales_tax_exemption
Datacenter tax incentive
8.98¢/kWh
Commercial electricity
7.45¢/kWh
Industrial electricity
8
Fiber providers
Low
Water stress
$9,290
Land price / acre
900
Cooling degree days
5,400
Heating degree days
51°F
Mean annual temp

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

How does Greene County compare with other counties in Ohio?

By number of scored sites, Greene County ranks 35th of the 85 Ohio counties with a county page, holding 0.9% of the state's 3,933 sites. Its average DC Readiness of 56.2/100 ranks 13th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1072nd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 25 score 55 or higher.

What types of datacenter sites are in Greene County?

Substation-Adjacent sites are the most common (23, 64% of the county's inventory), followed by former mine (5) and industrial (5). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Greene County?

Industrial electricity averages 7.45¢/kWh and commercial 8.98¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 8 fiber providers report service in the county. The climate runs 900 cooling degree days a year with a mean temperature of 51°F. Land is valued around $9,290 an acre.

By site type

Top datacenter sites in Greene County

Top datacenter sites in Greene County
SiteTypeVoltageCapacityQueue waitScore
SUGAR CREEKSubstation-Adjacent345 kV600 MW5.2 yrs65.2
GREENESubstation-Adjacent345 kV600 MW5.2 yrs64.8
BATHSubstation-Adjacent345 kV600 MW5.2 yrs63.4
OZ GreeneGreenfield——5.2 yrs62.1
The National Center for Medical Readiness at Calamityville (GSHP)Brownfield69 kV—5.2 yrs61.0
BELLBROOKSubstation-Adjacent138 kV100 MW5.2 yrs59.4
HEMPSTEADSubstation-Adjacent138 kV100 MW5.2 yrs59.3
ALPHASubstation-Adjacent138 kV100 MW5.2 yrs59.1
KNOLLWOODSubstation-Adjacent138 kV100 MW5.2 yrs59.0
UNKNOWN112992Substation-Adjacent138 kV100 MW5.2 yrs58.8
TREBEINSubstation-Adjacent138 kV100 MW5.2 yrs58.8
AIRWAYSubstation-Adjacent138 kV100 MW5.2 yrs58.8
OZ GreeneGreenfield——5.2 yrs56.9
TAP137593Substation-Adjacent69 kV50 MW5.2 yrs56.8
UNKNOWN113800Substation-Adjacent69 kV50 MW5.2 yrs56.5
TAP153881Substation-Adjacent69 kV50 MW5.2 yrs55.9
ENONSubstation-Adjacent69 kV50 MW5.2 yrs55.8
YELLOW SPRINGSSubstation-Adjacent69 kV50 MW5.2 yrs55.6
UNKNOWN153885Substation-Adjacent69 kV50 MW5.2 yrs55.6
UNKNOWN112898Substation-Adjacent69 kV50 MW5.2 yrs55.5
UNKNOWN113802Substation-Adjacent69 kV50 MW5.2 yrs55.4
UNKNOWN116592Substation-Adjacent69 kV50 MW5.2 yrs55.4
UNKNOWN112895Substation-Adjacent69 kV50 MW5.2 yrs55.3
TAP140028Substation-Adjacent69 kV50 MW5.2 yrs55.2
TAP140027Substation-Adjacent69 kV50 MW5.2 yrs55.2

Every scored site in Greene County

All 36 sites, best first.

Greene County datacenter FAQ

How many datacenter sites are in Greene County?

36 scored datacenter candidate sites, averaging 56.2/100 DC Readiness. That is the 35th-most of 85 Ohio counties with five or more sites.

What is the highest-scoring datacenter site in Greene County?

SUGAR CREEK scores 65.2/100 DC Readiness, the highest of the 36 scored sites in Greene County (a substation-adjacent site).

Does Greene County offer datacenter tax incentives?

DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

What is the natural-hazard risk in Greene County?

FEMA's National Risk Index rates Greene County as "Relatively Moderate" (score 30).

What are industrial electricity rates in Greene County?

Average industrial electricity is 7.45¢/kWh and commercial is 8.98¢/kWh in Greene County.

More in Ohio

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Greene County, Ohio”, https://gridcensus.com/datacenter-sites/ohio/greene-county (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Greene County, Ohio is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.