Datacenter Sites in Darke, Ohio
Darke has 24 scored datacenter candidate sites averaging 53.2/100 DC Readiness, with a catalogued aggregate of 350 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
24
Candidate sites
53.2/100
Avg DC Readiness
350 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for Darke
Yessales_tax_exemption
Datacenter tax incentive
9.45¢/kWh
Commercial electricity
7.94¢/kWh
Industrial electricity
9
Fiber providers
Low
Water stress
$10,913
Land price / acre
900
Cooling degree days
5,400
Heating degree days
51°F
Mean annual temp
Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.
By site type
Top datacenter sites in Darke
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Near Arcanum Peaking | Greenfield | — | — | 3.2 yrs | 58.0 |
| EC Near Arcanum Peaking | Greenfield | — | — | 3.2 yrs | 57.2 |
| EC Near Arcanum Peaking | Greenfield | — | — | 3.2 yrs | 57.0 |
| EC Near Arcanum Peaking | Greenfield | — | — | 3.2 yrs | 56.3 |
| EC Near Arcanum Peaking | Greenfield | — | — | 3.2 yrs | 55.8 |
| EC Near Arcanum Peaking | Greenfield | — | — | 3.2 yrs | 55.5 |
| EC Near Arcanum Peaking | Greenfield | — | — | 3.2 yrs | 55.4 |
| EC Near Arcanum Peaking | Greenfield | — | — | 3.2 yrs | 55.3 |
| EC Near Arcanum Peaking | Greenfield | — | — | 3.2 yrs | 55.1 |
| UNKNOWN114766 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.9 |
| EC Near Arcanum Peaking | Greenfield | — | — | 3.2 yrs | 54.7 |
| EC Near Arcanum Peaking | Greenfield | — | — | 3.2 yrs | 54.1 |
| UNKNOWN156489 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 53.9 |
| EC Near Arcanum Peaking | Greenfield | — | — | 3.2 yrs | 53.6 |
| UNKNOWN114768 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 52.6 |
| UNKNOWN116374 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 52.4 |
| TAP148475 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 52.2 |
| UNKNOWN140124 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 52.0 |
| Buckeye Beverage Site | Industrial | — | — | 3.8 yrs | 48.7 |
| Warren's Sunoco | Industrial | — | — | 3.8 yrs | 48.7 |
| Wright's Pennzoil | Industrial | — | — | 3.8 yrs | 48.7 |
| Beasecker's Dry Cleaners | Industrial | — | — | 3.8 yrs | 48.7 |
| Mine Site | Former Mine | — | — | 3.8 yrs | 48.3 |
| Jim's Union 76 | Industrial | — | — | 3.8 yrs | 47.9 |
Darke datacenter FAQ
- How many datacenter sites are in Darke?
- 24 scored datacenter candidate sites, averaging 53.2/100 DC Readiness.
- Does Darke offer datacenter tax incentives?
- DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.
- What is the natural-hazard risk in Darke?
- FEMA's National Risk Index rates Darke as "Relatively Moderate" (score 30).
- What are industrial electricity rates in Darke?
- Average industrial electricity is 7.94¢/kWh and commercial is 9.45¢/kWh in Darke.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Darke, Ohio. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.