Skip to content
Gridcensus

GENESSEO VOR

Federal Excess

Livingston County, New York · SPP

DC Readiness
55.6
Good / 100

GENESSEO VOR is a federal excess datacenter candidate site in Livingston County, New York, interconnecting through SPP. It screens at 55.6/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionSPP
Queue depth18
Avg queue wait3.3 yrs

Connectivity

Nearest IXPRochester Colo
IXP distance20.0 mi
Fiber providers5
Fiber coverage66.9%

Site characteristics

Acreage52 ac
Former useNavigation and Traffic Aids

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score65/100

Location context

Nearest datacenterLandmax Data Systems, Inc
DC distance12.1 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.83¢/kWh
Industrial electricity5.95¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$4,585

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
49
Fiber connectivity12%
77
Energy cost10%
50
Water risk8%
90
Natural hazard8%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Livingston County, ranked by DC Readiness.

Sites near GENESSEO VOR
SiteTypeVoltageCapacityQueue waitScore
EAST GOLAHSubstation-Adjacent115 kV100 MW4.9 yrs58.7
TAP144121Substation-Adjacent115 kV100 MW4.9 yrs58.6
GOLAHSubstation-Adjacent115 kV100 MW4.9 yrs58.6
MEYERSubstation-Adjacent230 kV300 MW4.9 yrs58.5
UNKNOWN161076Substation-Adjacent230 kV300 MW4.9 yrs58.5
TAP145541Substation-Adjacent115 kV100 MW4.9 yrs57.7
N LAKEVILLESubstation-Adjacent115 kV100 MW4.9 yrs57.4
OZ LivingstonGreenfield3.5 yrs57.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for GENESSEO VOR, Livingston County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.