Skip to content
Gridcensus

Livingston County, New York · NYISO

DC Readiness
57.7
Good / 100

N LAKEVILLE is a substation-adjacent datacenter candidate site in Livingston County, New York, interconnecting through NYISO. It screens at 57.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 4.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationN LAKEVILLE
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityNIAGARA MOHAWK POWER CORP.investor ownedmoderate to large load · terms ≥ 20 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionNYISO
Queue depth95
Avg queue wait4.9 yrs

Connectivity

Nearest IXPRochester Colo
IXP distance19.3 mi
Fiber providers5
Fiber coverage66.9%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterLandmax Data Systems, Inc
DC distance11.5 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.83¢/kWh
Industrial electricity5.95¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$4,585

Regulatory climate

Restrictivestate posture · as of 2026-08

First statewide moratorium (2026): 1-yr hold on certain permits for large DCs + impact study.

DC tax incentiveNo / suspended
Large-load threshold≥ 50 MW

Moratorium/permit hold targets large datacenters.

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track N LAKEVILLE

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
23
Fiber connectivity12%
78
Energy cost10%
50
Water risk7%
90
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Livingston County, ranked by DC Readiness.

Sites near N LAKEVILLE
SiteTypeVoltageCapacityQueue waitScore
MEYERSubstation-Adjacent230 kV300 MW4.9 yrs60.1
UNKNOWN161076Substation-Adjacent230 kV300 MW4.9 yrs59.8
EAST GOLAHSubstation-Adjacent115 kV100 MW4.9 yrs58.2
GOLAHSubstation-Adjacent115 kV100 MW4.9 yrs58.2
TAP144121Substation-Adjacent115 kV100 MW4.9 yrs58.1
TAP145541Substation-Adjacent115 kV100 MW4.9 yrs57.9
GENESSEO VORFederal Excess——3.3 yrs57.0
OZ LivingstonGreenfield——3.5 yrs56.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for N LAKEVILLE, Livingston County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.