SOLBERG-HUNTERDON AP

Federal Excess

Hunterdon, New Jersey · SPP

DC Readiness
55.8
Good / 100

SOLBERG-HUNTERDON AP is a federal excess datacenter candidate site in Hunterdon, New Jersey, interconnecting through SPP. It screens at 55.8/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth35
Avg queue wait3.3 yrs

Connectivity

Nearest IXP365 Data Centers Bridgewater (BW1)
IXP distance8.8 mi
Fiber providers5
Fiber coverage50.8%

Site characteristics

Acreage19 ac
Buildable load (est.)~819 MWland-based
Former useNavigation and Traffic Aids

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score72/100

Location context

Nearest datacenterDatacenter 00756382880
DC distance2.0 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.52¢/kWh
Industrial electricity8.24¢/kWh
Cooling degree days1,000
Heating degree days4,900
Land price / acre$17,886

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track SOLBERG-HUNTERDON AP

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
56
Fiber connectivity12%
81
Energy cost10%
50
Water risk7%
84
Natural hazard6%
72
Buildability7%
50
Labor market4%
50
DC cluster4%
100
Land / acreage3%
21
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Hunterdon, ranked by DC Readiness.

Sites near SOLBERG-HUNTERDON AP
SiteTypeVoltageCapacityQueue waitScore
GILBERTSubstation-Adjacent230 kV300 MW3.8 yrs63.2
UNKNOWN132374Substation-Adjacent230 kV300 MW3.8 yrs61.3
GLEN GARDNERSubstation-Adjacent230 kV300 MW3.8 yrs60.9
EC Near GilbertGreenfield2.6 yrs59.0
EC Near GilbertGreenfield2.6 yrs58.7
EC Near GilbertGreenfield2.6 yrs58.5
Fiberville Estates, LLC.Brownfield9 MW3.8 yrs57.9
EC Near GilbertGreenfield2.6 yrs57.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SOLBERG-HUNTERDON AP, Hunterdon. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.