Fiberville Estates, LLC.

Brownfield

Hunterdon, New Jersey · PJM

DC Readiness
57.9
Good / 100

Fiberville Estates, LLC. is a brownfield datacenter candidate site in Hunterdon, New Jersey, interconnecting through PJM. It screens at 57.9/100 DC Readiness with a catalogued 9 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN132947
Substation distance3.6 mi
Available capacity9 MW
Utility commercial rate0.10¢/kWh

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth222
Avg queue wait3.8 yrs

Connectivity

Nearest IXPTierPoint Bethlehem
IXP distance16.4 mi
Fiber providers5
Fiber coverage50.8%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance165.2 mi

Site characteristics

Site typeBrownfield
Land owner typeprivate
Buildability75.0/100
Former usemanufacturing
Existing capacity9 MW
Cleanup statuscleanup_complete

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteSTEM BROTHERS INC
Hazard sub-score62/100
Construction cost index121.7 (avg 100)

Location context

Nearest datacenterTierPoint Bethlehem
DC distance16.4 mi
Nearest rail1.7 mi
Nearest gas pipeline4.1 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.52¢/kWh
Industrial electricity8.24¢/kWh
Cooling degree days1,000
Heating degree days4,900
Land price / acre$17,886

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Fiberville Estates, LLC.

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
29
Speed to power20%
37
Fiber connectivity12%
75
Energy cost10%
99
Water risk7%
88
Natural hazard6%
62
Buildability7%
75
Labor market4%
50
DC cluster4%
65
Land / acreage3%
39
Construction cost3%
49
Gas pipeline2%
87
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Hunterdon, ranked by DC Readiness.

Sites near Fiberville Estates, LLC.
SiteTypeVoltageCapacityQueue waitScore
GILBERTSubstation-Adjacent230 kV300 MW3.8 yrs63.2
UNKNOWN132374Substation-Adjacent230 kV300 MW3.8 yrs61.3
GLEN GARDNERSubstation-Adjacent230 kV300 MW3.8 yrs60.9
EC Near GilbertGreenfield2.6 yrs59.0
EC Near GilbertGreenfield2.6 yrs58.7
EC Near GilbertGreenfield2.6 yrs58.5
EC Near GilbertGreenfield2.6 yrs57.8
EC Near GilbertGreenfield2.6 yrs57.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Fiberville Estates, LLC., Hunterdon. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.