Skip to content
Gridcensus

UNKNOWN132374

Substation-Adjacent

Hunterdon, New Jersey · PJM

DC Readiness
61.3
Good / 100

UNKNOWN132374 is a substation-adjacent datacenter candidate site in Hunterdon, New Jersey, interconnecting through PJM. It screens at 61.3/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN132374
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth222
Avg queue wait3.8 yrs

Connectivity

Nearest IXP365 Data Centers Bridgewater (BW1)
IXP distance15.0 mi
Fiber providers5
Fiber coverage50.8%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score72/100

Location context

Nearest datacenterVerizon Wireless NE Headquarters
DC distance7.9 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.52¢/kWh
Industrial electricity8.24¢/kWh
Cooling degree days1,000
Heating degree days4,900
Land price / acre$17,886

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN132374

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
37
Fiber connectivity12%
77
Energy cost10%
50
Water risk7%
84
Natural hazard6%
72
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
30
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Hunterdon, ranked by DC Readiness.

Sites near UNKNOWN132374
SiteTypeVoltageCapacityQueue waitScore
GILBERTSubstation-Adjacent230 kV300 MW3.8 yrs63.2
GLEN GARDNERSubstation-Adjacent230 kV300 MW3.8 yrs60.9
EC Near GilbertGreenfield2.6 yrs59.0
EC Near GilbertGreenfield2.6 yrs58.7
EC Near GilbertGreenfield2.6 yrs58.5
Fiberville Estates, LLC.Brownfield9 MW3.8 yrs57.9
EC Near GilbertGreenfield2.6 yrs57.8
EC Near GilbertGreenfield2.6 yrs57.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN132374, Hunterdon. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.