Wheelabrator Claremont Facility
BrownfieldSullivan County, New Hampshire · ISO-NE
Wheelabrator Claremont Facility is a brownfield datacenter candidate site in Sullivan County, New Hampshire, interconnecting through ISO-NE. It screens at 54.1/100 DC Readiness with a catalogued 5 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Site location
Get alerts
Track Wheelabrator Claremont Facility
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Sullivan County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| TAP136051 | Substation-Adjacent | 115 kV | 100 MW | 3.9 yrs | 56.0 |
| ASCUTNEY | Substation-Adjacent | 115 kV | 100 MW | 3.9 yrs | 55.0 |
| ASCUTNEY | Substation-Adjacent | 115 kV | 100 MW | 3.9 yrs | 55.0 |
| UNKNOWN136710 | Substation-Adjacent | 115 kV | 100 MW | 3.9 yrs | 54.9 |
| OZ Sullivan | Greenfield | — | — | 3.5 yrs | 53.0 |
| Wainshall Mill Buildings-Monadnock Mills Facility | Industrial | — | — | 3.9 yrs | 50.1 |
| Syd Clarke | Industrial | — | — | 3.9 yrs | 50.1 |
| Great Lakes | Industrial | — | — | 3.9 yrs | 50.1 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Wheelabrator Claremont Facility, Sullivan County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.