Skip to content
Gridcensus

Sullivan County, Vermont · ISO-NE

DC Readiness
53.2
Fair / 100

ASCUTNEY is a substation-adjacent datacenter candidate site in Sullivan County, Vermont, interconnecting through ISO-NE. It screens at 53.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationASCUTNEY
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW

Speed to power

ISO / RTO regionISO-NE
Queue depth4
Avg queue wait3.9 yrs

Connectivity

Nearest IXPVELCO Rutland
IXP distance34.6 mi
Fiber providers9
Fiber coverage57.4%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenterVELCO Rutland
DC distance34.6 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity15.53¢/kWh
Industrial electricity13.16¢/kWh
Cooling degree days400
Heating degree days7,200
Land price / acre$5,219

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
40
Fiber connectivity12%
32
Energy cost10%
50
Water risk8%
94
Natural hazard8%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Sullivan County, ranked by DC Readiness.

Sites near ASCUTNEY
SiteTypeVoltageCapacityQueue waitScore
Wheelabrator Claremont FacilityBrownfield5 MW3.5 yrs55.9
OZ SullivanGreenfield3.5 yrs54.5
UNKNOWN136710Substation-Adjacent115 kV100 MW3.9 yrs54.2
TAP136051Substation-Adjacent115 kV100 MW3.9 yrs54.2
ASCUTNEYSubstation-Adjacent115 kV100 MW3.9 yrs53.2
Mine SiteFormer Mine3.9 yrs52.4
Syd ClarkeIndustrial3.9 yrs52.4
American BrushIndustrial3.9 yrs52.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ASCUTNEY, Sullivan County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.